ISO/IEC 17025 guide
ISO 17025 assessment: what happens in the document review, the on-site assessment and witnessing
Clause by clause: ISO/IEC 17025:2017 requirements: every clause explained →
What the accreditation body reads before it visits, when a pre-assessment is worth having, how a two-day on-site assessment runs, what assessors check while witnessing a method, and how findings lead to the accreditation decision.
Key points
- An ISO/IEC 17025 assessment has three parts: the accreditation body reviews your documents, may offer an optional pre-assessment, then sends a lead assessor and technical assessors to your laboratory.
- Witnessing is what sets it apart from a management system audit. Assessors watch your staff perform the tests or calibrations on the application and then trace the result back through the records.
- Findings are written against a requirement and must be closed with evidence by the body's deadline. Some bodies allow about twelve weeks; others set a much shorter period.
- The assessment team recommends. The body's committee or council decides, and grants accreditation only for the scope the evidence supports.
What is an ISO/IEC 17025 assessment?
It is the accreditation body's examination of whether your laboratory is competent to produce the results named on your application. The body works to ISO/IEC 17011, the standard for accreditation bodies, and it assesses rather than audits: the question is not only whether procedures exist and are followed, but whether the people, equipment, methods and calculations behind each reported number can be trusted.
Three activities make up an initial assessment. The body first reviews what you submitted with the application. Many bodies then offer a pre-assessment, which you may decline. Finally a team visits the laboratory, examines the management system and the technical records, and watches work being performed. There is no Stage 1 or Stage 2 and no certification body; that vocabulary belongs to management system standards.
This guide covers what happens inside those three activities. The route from scoping to the decision is set out in the accreditation process, step by step, and selecting the body in choosing an accreditation body.
Document review: what the body reads before it visits
The application is more than a form. It carries the proposed scope of accreditation, meaning the tests or calibrations, methods, ranges and sites, together with the documents that show how the laboratory meets clauses 4 to 8. Reviewers use them to decide whether a visit is justified yet and which technical assessors it needs.
| What the reviewer looks for | Where it sits in the standard | What weakens the application |
|---|---|---|
| A scope schedule that names each method, the matrix or item type and the range | 5 Structural requirements; 7.2 Selection, verification and validation of methods | Methods listed that have never been verified, or ranges wider than the validation data |
| Competence requirements and who is authorised for which method | 6.2 Personnel | Job descriptions only, with no authorisation records |
| Equipment, calibration and the traceability route | 6.4 Equipment; 6.5 Metrological traceability | Calibration certificates from providers whose own accreditation cannot be shown |
| Uncertainty evaluation for the methods in scope | 7.6 Evaluation of measurement uncertainty | Uncertainty promised "later" or copied from a method standard without laboratory data |
| Proficiency testing done or planned, and what was done with the results | 7.7 Ensuring the validity of results | No completed round, or unsatisfactory results with no recorded action |
| The management system option and its records | 8.1 Options; 8.8 Internal audits; 8.9 Management reviews | An internal audit that skipped the technical clauses, or a review with no decisions |
The reviewer may come back with questions or ask for missing evidence before scheduling the visit. Treat those requests as early findings: answer them fully rather than promising the evidence on the day. Which records each clause needs is covered in the documentation guide.
Is a pre-assessment worth it?
Several bodies offer one. UKAS describes it as an informal visit before the initial assessment to gauge how ready you are, and A2LA and NABL also list a pre-assessment as an option in their process. Nothing in it leads to a decision.
A pre-assessment earns its cost when the scope is technically broad, when the laboratory has never been assessed before, or when you suspect a gap in traceability or validation but cannot tell how the body will view it. It adds less when an independent internal audit has already covered every technical clause.
The on-site assessment, day by day
The body sends a plan beforehand that names the team and the activities to be witnessed. The length depends on the number of methods, disciplines and sites; a single-discipline laboratory with a short scope may need a day or two, while a multi-discipline scope takes longer and may bring several technical assessors at once. The pattern below is typical of a two-day visit for a small testing laboratory.
| When | What happens | Who is needed | What is examined |
|---|---|---|---|
| Day 1, first hour | Opening meeting: scope, plan, confidentiality, how findings will be handled | Laboratory manager, quality manager, technical leads | Any changes since the application |
| Day 1, morning | Lead assessor on the management system; technical assessors tour the laboratory | Quality manager; staff in each area | Impartiality, document and record control, facilities and environmental monitoring |
| Day 1, afternoon | First witnessing sessions and record trails | Authorised analysts or calibration staff | Selected methods performed live, then their raw data, equipment and calculations |
| Day 2, morning | Further witnessing; uncertainty, validation and proficiency testing files | Technical leads, whoever built the uncertainty budgets | Validation data, uncertainty evaluation, control charts, PT results and actions |
| Day 2, early afternoon | Complaints, nonconforming work, internal audit, management review, reports | Quality manager, top management | Sample reports or certificates checked against the required content |
| Day 2, close | Team meets privately, then the closing meeting | Laboratory manager and anyone who will own corrective action | Findings read out and confirmed in writing; next steps and deadline |
Keep the people named in the plan free for the whole visit; assessor time spent waiting is time you pay for.
Witnessing: how assessors watch the work
ANAB puts it plainly: the laboratory demonstrates technical competence through method witnessing. A technical assessor asks an authorised member of staff to perform a method on the application, on a real item, a retained sample or a proficiency testing material, while they observe.
During the demonstration the assessor checks that the person follows the current version of the method, uses the equipment listed for it, records observations at the time they are made, and handles items and reference materials as the procedure says. Afterwards the assessor usually traces the result backwards: technical record, equipment calibration and traceability, environmental conditions, the operator's authorisation and the uncertainty applied. The technical records must let someone else reconstruct the result; witnessing is where that is tested.
Not every method is witnessed. The team samples, usually favouring methods that carry the most risk, those that are newly validated, and at least one from each discipline or technique. Choosing which methods go on the application is covered in the scope of accreditation guide; the method evidence itself in method verification and validation and measurement uncertainty.
Findings, corrective action and the decision
Each finding names the requirement, the evidence seen and why it falls short. Agree the facts at the closing meeting, and raise any disagreement then, with evidence. Findings are then answered in writing, normally with the cause, the correction and the corrective action, supported by records.
Deadlines differ. UKAS allows about twelve weeks to provide suitable evidence for mandatory findings, while NABL's guidance sets 30 days. How to analyse, write and close them is the subject of the nonconformities guide, and what assessors tend to ask in assessor questions.
Once findings are closed, the assessment team's recommendation goes to a committee or council at the body that did not take part in the visit. Accreditation is granted for the scope the evidence supports. The certificate and the public schedule follow, and surveillance begins; UKAS, for example, makes its first surveillance visit six months after the grant.
How Sterling prepares laboratories for the assessment
Findings raised by us first, not by the assessor
Before the application goes in, our expert and experienced consultants carry out an internal audit that covers the technical clauses as well as the management system, observing your staff perform methods on the scope and following a trace from report back to calibration certificate. Management review follows, and every finding is closed with evidence. We then stay with you through document review questions, the on-site assessment and the corrective action responses. Sterling does not accredit; the accreditation body assesses and decides. We ensure successful accreditation for our clients.
Book a free discovery callISO 17025 assessment: questions buyers ask
How long does an ISO/IEC 17025 on-site assessment last?
It depends on the scope: a small, single-discipline laboratory may be assessed in one or two days, while several disciplines or sites need more days and more technical assessors. The body sets the duration when it plans the visit, based on the methods and sites in your application.
What happens if a witnessed test goes wrong in front of the assessor?
A single mistake that the analyst notices, records and handles as the procedure requires can actually demonstrate a working system. What leads to a finding is an error nobody detects, a step the method does not allow, or records that do not match what the assessor saw.
Can we use a retained sample or a proficiency testing item for witnessing?
Usually yes, if the item is suitable for the method and the assessor agrees. Confirm it when the plan is issued.
Will the assessors tell us how to fix a finding?
No. Assessors explain what they saw and which requirement it relates to, but designing the correction is your laboratory's job, because an accreditation body cannot assess solutions it helped create.
Can part of an ISO/IEC 17025 assessment be done remotely?
Some bodies carry out parts of document review or record examination remotely, but witnessing needs the work to be observed as it happens, so most initial assessments include time at the laboratory. Confirm the arrangement with your body when it issues the plan.
Do we have to fix every finding before accreditation is granted?
Findings must be closed to the body's satisfaction by its deadline. Where a finding affects only one method, some bodies grant accreditation for the rest of the scope and leave that method off the schedule until the evidence is accepted.
More ISO/IEC 17025 guides
Every guide in the ISO/IEC 17025 series is written for one question and links back to the hub for the whole picture.
- ISO/IEC 17025 accreditation process, step by step
- ISO/IEC 17025 accreditation cost: what moves the price
- ISO/IEC 17025 documentation: what you need
- ISO/IEC 17025 internal audit: the technical clauses
- Measurement uncertainty under ISO/IEC 17025: a budget you can defend
- ISO/IEC 17025 requirements explained, clause by clause
- ISO 17025 accreditation in Singapore and South East Asia
- ISO 17025 for small laboratories
- ISO 17025 surveillance and reassessment
- ISO 17025 accreditation in the Philippines
- ISO 17025 accreditation in the UAE and GCC
- ISO 17025 accreditation in the UK
Keep exploring
Explore more about ISO/IEC 17025
Watch a video on how to implement ISO 17025 here.
Watch a video on ISO 17025 requirements here.
ISO/IEC 17025 resources
Services for ISO/IEC 17025
Talk to a consultant
Walk into your ISO/IEC 17025 assessment with every finding already found and closed.
Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.
hello@sterling-grc.com+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page
What would you like to achieve?
Choose a starting point. The enquiry form takes about a minute.
Book my free discovery callContinue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice