ISO/IEC 17025 guide
ISO 17025 nonconformities: how assessment findings are raised, answered and closed under ISO/IEC 17025
Clause by clause: ISO/IEC 17025:2017 requirements: every clause explained →
How accreditation bodies raise and set deadlines for ISO/IEC 17025 findings, how to read one, correction versus corrective action, the impact check on issued results, the evidence that closes a finding, and eight typical laboratory findings.
Key points
- An ISO/IEC 17025 nonconformity is a requirement the assessment team found unmet: in the standard, in the accreditation body's own rules or in your laboratory's procedures, for the scope you applied for.
- There is no single worldwide grading scheme or deadline. Each accreditation body sets its own terms; UKAS, for example, allows about 12 weeks to evidence mandatory findings.
- Every finding needs three things: a correction, a cause that explains it, and a corrective action that removes the cause. Technical findings also need an impact check on results already reported.
- Closure is judged on evidence dated after the assessment, and the body's committee decides on accreditation only once the findings are dealt with.
What counts as a nonconformity in an ISO/IEC 17025 assessment?
During the on-site assessment, the lead assessor examines the management system while technical assessors watch your staff perform tests or calibrations and trace the records behind the numbers. Whenever they find something that falls short of a requirement, they raise a finding. The requirement can come from three places: ISO/IEC 17025:2017 itself, the accreditation body's own accreditation rules (ANAB, for instance, requires laboratories to take part in proficiency testing every year), or the procedures your laboratory wrote and said it follows.
Findings are tied to the methods on your application, so preparation has to reach every method in scope, not just the quality manual. The ISO/IEC 17025 assessment guide explains how document review, the on-site visit and witnessing produce these findings; this guide starts where they are handed to you.
How accreditation bodies set grades and deadlines
Certification audits of management systems use a common major and minor grading. Laboratory accreditation has no equivalent published in one place: each body writes its own procedure, names its own categories and fixes its own response period. Read it before the assessment. Four examples:
| Accreditation body | After the on-site assessment | Who decides |
|---|---|---|
| UKAS (United Kingdom) | Approximately 12 weeks to provide suitable evidence for mandatory findings | UKAS grants accreditation, issuing a certificate and a public schedule |
| NABL (India) | Corrective action submitted within 30 days, as its FAQ describes the process | NABL's Accreditation Committee |
| EIAC (UAE) | Corrective actions within a defined period set by EIAC | A case file goes forward to the accreditation decision |
| A2LA (USA) | A corrective action response to the findings | A panel of the A2LA Accreditation Council votes |
Whatever the body, the decision-maker considers accreditation only after your response has been reviewed, so a late or thin response moves the decision date and any tender waiting on it.
Reading a finding: requirement, evidence and statement
A well-written finding names the requirement, shows the objective evidence and states the gap. Taking an example from a calibration bench:
- Requirement: ISO/IEC 17025 sub-clause 6.5, Metrological traceability, for results reported under the pressure calibration method in scope.
- Evidence: the reference gauge used for two of the three calibrations witnessed was last calibrated by a provider whose certificate showed no traceability statement and no measurement uncertainty.
- Statement: the laboratory could not demonstrate traceability of the reference standard used for the pressure calibrations in scope.
Check each part before you acknowledge the finding. If the traceable certificate exists but sat in someone's inbox, produce it while the team is still on site. If the finding is accurate, spend your energy on the cause; the solution is yours to find.
Correction, root cause and corrective action in a laboratory
ISO/IEC 17025 separates two ideas that responses often merge. Sub-clause 7.10, Nonconforming work, deals with work or results that did not meet your procedures or the customer's agreed requirements. Sub-clause 8.7, Corrective actions, under Option A, deals with removing causes so the problem does not come back. A laboratory on Option B handles corrective action through its ISO 9001 system, but the assessor still expects the same logic. A strong response to the traceability finding above runs in four steps.
1. Correction
Send the reference gauge to a calibration provider that can show traceability, and suspend the method or use another traceable standard meanwhile.
2. Impact on results already issued
This is the step laboratories forget. List every certificate issued with that gauge since its last valid traceable calibration, judge whether the results could be affected, and treat affected work under your nonconforming work procedure. Where a report must change, follow your arrangements for amendments to reports (sub-clause 7.8.8) and tell the customer.
3. Root cause
Ask why the gauge went to that provider. In this example, purchasing chose on price and nobody checked calibration suppliers against criteria for externally provided services (sub-clause 6.6). The cause is a process gap, not the technician who booked the job. Check whether other equipment was calibrated the same way.
4. Corrective action and effectiveness
Set criteria for calibration providers, re-evaluate the current ones, and add a traceability check to the review of every incoming calibration certificate. Then confirm, over the next calibration cycle, that each certificate received was checked and recorded.
What evidence closes an ISO/IEC 17025 finding?
Accreditation bodies close findings on proof that change has happened, not on a promise that it will. Evidence that usually persuades a reviewer:
- new records dated after the assessment, such as the traceable calibration certificate with its uncertainty;
- the revised procedure or form with its approval and new revision, plus the first completed records under it;
- the impact review of results already reported, with the decision taken for each affected report;
- for technical findings, the repeated work itself: a completed validation file, a revised uncertainty budget, or fresh quality control data;
- a cause analysis a reviewer who was not on site can follow.
Some fixes cannot finish inside the deadline: proficiency testing rounds run on the provider's calendar, and quality control data takes time to build. Say so in the response, show the interim evidence, give the date the rest will follow, and agree the approach with the body rather than letting the deadline pass in silence.
Eight typical ISO/IEC 17025 findings and how laboratories fix them
These are composites of common laboratory situations, not extracts from any report; how each is categorised depends on the body and on whether reported results were affected.
| Finding | Sub-clause | Correction | Corrective action |
|---|---|---|---|
| An analyst witnessed on a method had no authorisation record for it | 6.2 Personnel | Assess and authorise the analyst; supervise until done | Authorisation by method, checked before rostering |
| A balance used for reported results had missed its intermediate check twice | 6.4 Equipment | Perform the check; review results since the last good check | Check schedule with a named owner and a deputy |
| An in-house method was in scope with no validation file | 7.2.2 Validation of methods | Validate before further reporting; hold results in question | Validation required before any method enters routine use |
| The uncertainty budget left out sample preparation, the largest contributor | 7.6 Evaluation of measurement uncertainty | Re-evaluate the budget; check affected conformity statements | Budgets reviewed when methods, equipment or staff change |
| An unsatisfactory proficiency testing result had no recorded investigation | 7.7 Ensuring the validity of results | Investigate the result and the work tested since | Every questionable or unsatisfactory result logged and reviewed |
| A result could not be traced back to the analyst, instrument and raw data | 7.5 Technical records | Reconstruct the record from what exists; document gaps | Worksheet fields that capture who, what and when |
| Pass or fail statements were issued with no decision rule agreed with the customer | 7.8.6 Reporting statements of conformity | Agree the rule with affected customers; amend reports where needed | Decision rule settled at contract review (7.1) |
| The internal audit covered documents and records but no technical method | 8.8 Internal audits | Audit the technical activities in scope before responding | Programme including witnessing of methods by a competent auditor |
How to keep assessment findings few and small
Most first-assessment findings can be seen coming. Run your internal audit across the technical clauses, with methods witnessed, not just paperwork read. Close its findings through the corrective action process the assessor will test. Take a pre-assessment where your body offers one. The common mistakes guide lists the ten that most often fail assessments, and the surveillance and reassessment guide covers findings raised later in the accreditation cycle.
How Sterling handles assessment findings
Findings answered with evidence the reviewer can follow.
Sterling's expert and experienced consultants audit the technical clauses before your application, so gaps surface while there is still time to act. When the assessment team raises a finding, we work through the cause and the impact on issued results with your technical staff and help you write a response that meets the body's deadline. The corrective action records sit in Effivity, included with the engagement at no additional cost, linked to the technical evidence in your own laboratory systems. We ensure successful accreditation for our clients. Sterling does not accredit; the accreditation body reviews your response and decides.
Book a free discovery callISO/IEC 17025 nonconformities: questions buyers ask
How long do we have to close ISO 17025 nonconformities?
As long as your accreditation body allows, stated in its own procedure and confirmed at the closing meeting. UKAS allows about 12 weeks to evidence mandatory findings and NABL describes a 30-day corrective action submission; other bodies set their own periods.
Is an assessor's finding the same as nonconforming work under 7.10?
No. Nonconforming work is a result or activity that did not meet your procedures or the customer's requirements, and you handle it every day. An assessor's finding is a gap in how your laboratory meets the standard; you answer it through corrective action.
Do we have to recall reports issued before the finding?
Only where your impact review shows reported results could be wrong. Decide report by report, amend where needed, inform the customer and record each decision.
Can we challenge a finding we believe is wrong?
Yes, with evidence, and ideally before the assessment team leaves. Show the record that meets the requirement. If you still disagree afterwards, the body's own procedure describes the route.
Will the corrective action be checked again at surveillance?
Expect later visits to look at whether earlier actions held, so keep effectiveness records rather than closing the file the day the body accepts your response.
More ISO/IEC 17025 guides
Every guide in the ISO/IEC 17025 series is written for one question and links back to the hub for the whole picture.
- ISO/IEC 17025 accreditation process, step by step
- ISO/IEC 17025 accreditation cost: what moves the price
- ISO/IEC 17025 documentation: what you need
- Effivity for ISO/IEC 17025: the guide
- ISO/IEC 17025 internal audit: the technical clauses
- ISO 9001 vs ISO/IEC 17025: what accreditation adds
- Measurement uncertainty under ISO/IEC 17025: a budget you can defend
- Method verification and validation under ISO/IEC 17025
- ISO 17025 accreditation in the Netherlands and Europe
- ISO 17025 proficiency testing
- ISO/IEC 17025 requirements explained, clause by clause
- ISO 17025 scope of accreditation
Keep exploring
Explore more about ISO/IEC 17025
Watch a video on how to implement ISO 17025 here.
Watch a video on ISO 17025 requirements here.
ISO/IEC 17025 resources
Services for ISO/IEC 17025
Talk to a consultant
Answer your ISO/IEC 17025 assessment findings with evidence, on time.
Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.
hello@sterling-grc.com+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page
What would you like to achieve?
Choose a starting point. The enquiry form takes about a minute.
Book my free discovery callContinue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice