ISO/IEC 17025 guide
ISO 17025 method validation and verification: which applies, and what the file must show
Clause by clause: ISO/IEC 17025 clause 7.2: verification versus validation →
When a laboratory verifies a published method and when it validates its own, what each file must contain for the accreditation body, a worked example of four methods and the mistakes assessors most often find in method files.
Key points
- ISO/IEC 17025 treats method selection, verification and validation as one requirement area (7.2) with two parts: selection and verification of methods, and validation of methods.
- A published standard method is verified: the laboratory shows it can perform the method as written, with its own people, equipment and conditions. A method the laboratory developed itself is validated: the laboratory shows the method is fit for its intended use.
- Both routes end in a file an assessor can read without you in the room: what was planned, what was measured, how it compares with what was needed, and who concluded the method may be used.
- Validation and verification come before measurement uncertainty, quality control data and proficiency testing mean anything, which is why they sit early in every accreditation plan.
ISO 17025 method validation or verification: which one applies?
The first question on every method in your intended scope is simple: did someone else design and publish it, or did your laboratory write it? The answer decides the route and the size of the file.
For a published standard method, the method's authors have already done the design work. Your job is to verify it: to prove that your analysts, your instruments and your environment reproduce what the method promises. For an in-house method, nobody has done that design work except you, so you validate it: you establish, with evidence, that the method does what the customer's decision needs.
Grey areas are where laboratories get caught. A published method with a changed sample size, an extra clean-up step, a different instrument technique or a matrix the method never mentions is no longer the method its authors tested. Sterling's working rule is to treat any change you would have to explain to an assessor as a reason to move the method from the verification route to the validation route, and to record that decision. Check the exact triggers against clause 7.2.2 in your licensed copy of the standard before you finalise the method list.
The wider picture of clause 7, and where methods sit among the other process requirements, is covered in ISO/IEC 17025 requirements explained.
Selecting methods before you prove them
Proof work is expensive, so settle four questions before anyone runs a replicate.
- What does the customer need to decide? A pass or fail against a limit, a trend over time and a calibration value with a stated uncertainty each place different demands on the method.
- Which method does the customer, the regulator or the tender name? If a specific published method is written into the requirement, a laboratory alternative may not be accepted, however good it is.
- Is the edition you hold current? Keep a method register that shows the edition in use, where it came from and when it was last checked against the publisher.
- Can you resource it? Equipment, reference materials, environmental control and trained staff all need to exist before verification can start.
Agreeing the method with the customer belongs in the contract review. If the method changes later, the customer should hear about it before the report does.
What a verification file should show
Verification is lighter than validation, but it is not a signature on a form: the assessor wants evidence of your own performance against the method.
A short plan
State the method and edition, the scope you will claim (items, matrices or ranges), the characteristics you will check and the acceptance criteria, taken from the method itself where it gives them and from the customer's need where it does not.
Evidence from your own bench
Run the checks with the analysts who will do the routine work, on the equipment listed in the equipment register, using reference materials or reference standards whose traceability you can show. Sterling typically builds the plan around the performance the method claims, such as its precision and its agreement with a known value, and the range you intend to report; confirm the characteristics that apply to your discipline against the method and the accreditation body's guidance.
A conclusion someone owns
Compare the results with the criteria, record any limitation (a narrower range, a matrix excluded), and have the technically responsible person sign that the method is fit to go on the scope. That signature is also where analyst authorisation for the method begins.
What a validation file should show
A validation file tells the whole story of an in-house method, from the requirement to the decision. Assessors often read it line by line.
- The requirement. What the result is for, what quantity is measured, over what range and in which items, and how good the result must be for the customer's decision.
- The method as it stands. A controlled, written procedure, frozen at the version being validated, so the evidence relates to the method you will actually run.
- The plan. Which performance characteristics you will determine, how, how many runs and by whom, and the criteria for acceptance, all set before the data exist.
- The data. Raw results, calculations and instrument records that let someone reconstruct every conclusion, including runs that failed and what was done about them.
- The comparison. Each characteristic against its criterion, in a table, with no conclusion stronger than the data support.
- The statement. A dated decision that the method is fit for its intended use, with any limits, and the name of the person authorised to make it.
The same data usually feed the uncertainty budget, so plan the two together; the method for that budget is set out in Measurement uncertainty under ISO/IEC 17025. Traceability of the reference standards and equipment used in the work belongs to Equipment, calibration and metrological traceability under ISO/IEC 17025.
Worked example: one laboratory, four methods
An illustrative case: a testing laboratory prepares its first application with four methods. The table shows how each is routed and what its file needs. The details are invented for explanation.
| Method | Route | Why | What the file needs |
|---|---|---|---|
| A national standard test for a construction material, run exactly as published | Verification | Published and unchanged | Plan, results from the analysts who will run it, comparison with the method's stated performance, sign-off |
| The same standard test on a material the standard does not cover | Validation (Sterling's working rule) | Used outside what the method describes | Requirement, plan, full performance data for the new material, statement of fitness with limits |
| An instrument manufacturer's application note adopted as a procedure | Validation | Not a published standard method; the laboratory owns the method once adopted | Controlled procedure, full validation evidence, the manufacturer's data used only as background |
| A method the laboratory's chemists wrote for a customer's product | Validation | Developed in-house | Customer requirement, design record, full validation, agreed reporting limits |
Only after each file closes do the methods move on to routine quality control and proficiency testing and interlaboratory comparison, which then show that the performance holds over time.
How Sterling works on methods
Method files built with your analysts, ready for witnessing
Sterling's expert and experienced consultants review your method list in the gap analysis, route each method to verification or validation, write the plans with your technical staff and check every file before the application goes in. The management system records sit in Effivity, included with the engagement at no additional cost. Sterling does not accredit; the accreditation body assesses and decides. We ensure successful accreditation for our clients.
Book a free discovery callMistakes assessors find in method files
- Criteria written after the results. Acceptance limits chosen to fit the data prove nothing. Set them in the plan and date the plan.
- Verification done by the wrong people. A supervisor runs the checks and three other analysts do the routine work. Each person who reports results needs evidence of their own competence on the method.
- The file describes a different method. The procedure was edited after validation and nobody reassessed it. Link every file to a controlled version.
- Scope wider than the evidence. The application claims a range or matrix the data never covered. Claim what you proved; extend later.
- Old methods left unproven. A method in use for years is assumed to be fine. Long use is not evidence; build the file.
How assessors test these files in person is covered in The ISO/IEC 17025 assessment, and how your own auditors should examine them in ISO/IEC 17025 internal audit: the technical clauses.
Method validation under ISO/IEC 17025: questions buyers ask
What is the difference between method verification and method validation in ISO 17025?
Verification proves your laboratory can perform a published method as written; validation proves a method is fit for its intended use. Verification applies to unchanged standard methods, validation to methods you developed or adapted yourself.
Do standard methods need to be validated under ISO/IEC 17025?
An unchanged published standard method is normally verified rather than validated, because its authors have already established its performance. Once you change it or use it beyond what it describes, plan to validate it and check the triggers in clause 7.2.2 of the standard.
How long does method validation take for accreditation?
It depends on the number of methods, how many runs each plan needs and the laboratory's routine workload, so there is no single figure. It is one of the reasons a first accreditation typically takes six to twelve months; see the ISO/IEC 17025 timeline guide.
Can we use a manufacturer's validation data instead of our own?
Not on its own. A manufacturer's data can support your plan, but the accreditation body will expect evidence produced in your laboratory, by your staff, on your equipment.
Do methods we have used for years still need a validation or verification file?
Yes, every method on the scope of accreditation needs its file, however long it has been in use. Existing records and quality control data may shorten the work, provided they can be traced to the current version of the method.
Who can sign off a method as fit for use?
The person your laboratory has made technically responsible for that discipline, named in your authorisations. Record the decision with a date and any limits, because assessors ask who concluded the method was fit and on what evidence.
More ISO/IEC 17025 guides
Every guide in the ISO/IEC 17025 series is written for one question and links back to the hub for the whole picture.
- ISO/IEC 17025 accreditation process, step by step
- ISO/IEC 17025 accreditation cost: what moves the price
- ISO/IEC 17025 documentation: what you need
- Effivity for ISO/IEC 17025: the guide
- ISO/IEC 17025 internal audit: the technical clauses
- ISO 9001 vs ISO/IEC 17025: what accreditation adds
- ISO 17025 management review
- Measurement uncertainty under ISO/IEC 17025: a budget you can defend
- Method verification and validation under ISO/IEC 17025
- ISO 17025 accreditation in the Netherlands and Europe
- ISO 17025 nonconformities
- ISO 17025 proficiency testing
- ISO/IEC 17025 requirements explained, clause by clause
Keep exploring
Explore more about ISO/IEC 17025
Watch a video on how to implement ISO 17025 here.
Watch a video on ISO 17025 requirements here.
ISO/IEC 17025 resources
Services for ISO/IEC 17025
Talk to a consultant
Get every method on your intended scope routed, planned and proven before the application.
Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.
hello@sterling-grc.com+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page
What would you like to achieve?
Choose a starting point. The enquiry form takes about a minute.
Book my free discovery callContinue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice