ISO/IEC 17025 guide
ISO 17025 management review: what laboratory management must review, decide and record under ISO/IEC 17025
Clause by clause: ISO/IEC 17025:2017 requirements: every clause explained →
Where management review sits in ISO/IEC 17025:2017, the technical and quality inputs a laboratory review should cover, the decisions it must reach, who attends, a quarterly agenda, and the record an assessor follows.
Key points
- In ISO/IEC 17025:2017 management review sits in clause 8.9, Management reviews, one of the Option A management system requirements; a laboratory on Option B holds its review under ISO 9001 and must still show it supports clauses 4 to 7.
- A useful laboratory review is fed by the technical record, not only the quality record: impartiality risks, proficiency testing, quality control trends, nonconforming work, complaints and assessment findings.
- The review earns its place only when it ends in decisions on the system, on improvement and on resources, each with an owner and a date.
- Sterling recommends a short quarterly review with one full annual review, and the first complete one held after the internal audit and before the application to the accreditation body.
What ISO/IEC 17025 requires of management review
Management review is the moment when the people accountable for the laboratory stop running it for an hour and look at whether it is working. ISO/IEC 17025:2017 places it in clause 8, Management system requirements, as sub-clause 8.9, Management reviews. It belongs to Option A, the set of eight management system elements a laboratory must address at minimum, alongside documentation, document and record control, risks and opportunities, improvement, corrective action and internal audits.
Option B changes where the requirement lives, not whether it applies. A laboratory whose management system already meets ISO 9001 can rely on that system for the intent of 8.2 to 8.9, provided it supports and demonstrates consistent fulfilment of clauses 4 to 7. In practice that means the ISO 9001 review agenda has to carry the laboratory's technical performance too; a corporate quality review that never mentions proficiency testing or measurement uncertainty will not satisfy an assessor.
If the review never asks whether results are still sound, it has missed the point of the standard. The requirements guide covers the rest of clause 8.
What goes into a laboratory's review
The inputs worth bringing are the ones that show whether clauses 4 to 7 are holding up in daily work. Sterling's recommended input set follows the standard's own structure, so nothing technical is left out.
From the general and structural requirements
The impartiality risk assessment and any new pressures on it: a change of ownership, a large customer, a commercial target that touches results. Changes to the range of laboratory activities, new sites, or changes in the organisation chart and authorities.
From resources
Competence and authorisation status by method, staff turnover and training gaps; environmental monitoring excursions; equipment out of calibration, overdue intermediate checks and breaks in the traceability chain; the performance of calibration providers, reference material suppliers and proficiency testing providers.
From the process requirements
Contract review issues, including any dispute over a decision rule; methods awaiting verification or validation; uncertainty budgets that need revisiting; quality control trends and proficiency testing results with the actions taken on unsatisfactory scores; report amendments; complaints; nonconforming work; and the state of data and information systems.
From the management system
Actions from the previous review, internal audit results, corrective actions and whether they worked, the risk and opportunity register, improvement projects, and findings from the accreditation body's last assessment or surveillance visit.
Proficiency testing and the internal audit of the technical clauses have their own guides in this cluster; the review needs their conclusions, not their working.
What the review must decide
The output of a laboratory review should answer three questions: is the management system and the way the laboratory works still effective, what will be improved, and what resources are needed to keep results valid. Each answer becomes a recorded decision.
- Changes to the system: a revised procedure, a new control on impartiality, an amended decision rule policy, a change to the internal audit programme.
- Improvement: a method to be validated for a wider range, a control chart to be introduced where drift was noticed late, a reporting template to be corrected after amendments.
- Resources: a second authorised analyst for a single-person method, recalibration funding, a replacement balance, environmental control for a room that keeps drifting, time released for validation work.
- Scope: whether to apply for an extension, withdraw a test that is rarely requested, or hold a planned extension until proficiency testing evidence exists.
Every decision needs an owner and a due date, and the next review opens by checking them. That loop is what an assessor looks for.
How often, and who should attend
Set the interval in your own management system and keep to it; an assessor will judge the laboratory against the plan it wrote. Sterling recommends a short review every quarter that covers the fast-moving inputs, with one full annual review that takes every input and the year's trends together.
Attendance follows clause 5. The people who hold authority over resources must be there, because resource decisions are half the output. So must the people with technical responsibility and management system responsibility shown on the organisation chart. In an in-house laboratory that usually means the budget holder, the laboratory manager, each technical lead and the quality manager.
Running it in one meeting a quarter
The agenda below is Sterling's recommended quarterly format for a laboratory with two or three disciplines in scope. It takes about 90 minutes when inputs are circulated a week ahead and presenters bring one page each.
| Agenda item | What is presented | Who presents | Time |
|---|---|---|---|
| Open actions from the last review | Each action, its status and evidence of completion | Quality manager | 10 min |
| Impartiality and scope | Changes to the impartiality risk assessment, activities, sites or authorities | Laboratory manager | 10 min |
| Validity of results | Quality control trends, proficiency testing results and the actions on any unsatisfactory score | Technical lead per discipline | 20 min |
| People, equipment and traceability | Authorisations, training gaps, calibration status, environmental excursions, provider performance | Technical leads | 15 min |
| Customers and nonconforming work | Complaints, report amendments, nonconforming work and contract review issues | Quality manager | 10 min |
| Audits, assessments and corrective action | Internal audit results, accreditation body findings, corrective action effectiveness, risk register | Quality manager | 15 min |
| Decisions | Changes to the system, improvements, resources and scope, with owners and dates | Chair | 10 min |
The record an assessor asks for
Keep minutes, not slides. The review record should let an assessor, or a new laboratory manager, see four things without asking anyone: who attended, which inputs were covered and what they showed, what was decided, and who owns each action by when.
A practical test, and one assessors often apply, is to follow a single thread. They pick an unsatisfactory proficiency testing result or a complaint from the technical records, then look for it in the review minutes, the decision taken and the corrective action that closed it. A thread that breaks at the review tells them management was not told, or was told and did nothing.
How Sterling runs the first review
A first management review built from your own technical record
Our expert and experienced consultants prepare the input pack with your technical leads, chair the first review alongside laboratory management, and set the agenda, minutes and action tracking in Effivity, included with the engagement at no additional cost. The review follows the internal audit, and every finding is closed with evidence before you apply. We ensure successful accreditation for our clients.
Book a free discovery callWhat a weak laboratory review looks like
Weak reviews look tidy until the record is read against the rest of the laboratory.
- Quality only: the minutes discuss document control and training attendance but never mention proficiency testing, quality control or uncertainty.
- Noted, not decided: every input is marked "discussed" and no decision follows, even for a failed proficiency testing round.
- The same actions every quarter: open actions carry forward with new dates and no evidence.
- Resources never mentioned: a single authorised analyst for a critical method is noted as a risk year after year, with no decision.
- Held for the assessor: one review, dated the week before the application, and none since.
Each of these is a common route to a finding. The nonconformities guide explains how findings are raised and closed; the surveillance and reassessment guide covers how reviews continue to be examined after accreditation.
How Effivity holds the review
Effivity's management review module lets you define the agenda or start from a suggested one, notifies attendees by e-mail, records minutes against each agenda point and turns decisions into action plans with owners and dates. The laboratory's technical records, such as control charts, uncertainty budgets and proficiency testing reports, stay in the systems where they are produced and are linked or attached as evidence.
ISO 17025 management review: questions buyers ask
How many management reviews must a laboratory hold before applying for accreditation?
At least one complete review, covering every input, should be on record before the application, held after the internal audit so its results feed the review. Sterling does not recommend applying on a single review held for the purpose; two quarterly reviews show the loop working.
Can management review be combined with the ISO 9001 review in a certified organisation?
Yes, one meeting can serve both if the agenda carries the laboratory's technical inputs and the minutes record decisions on them. This is the usual arrangement under Option B, and the laboratory section should be minuted separately so an assessor can find it.
Who should chair an ISO 17025 management review in an in-house laboratory?
The person with authority over the laboratory's resources should chair it, usually the plant, operations or quality head.
Does a failed proficiency testing round have to wait for the next management review?
No, it is handled at once through nonconforming work and corrective action. The review later looks at the result, the action taken, whether it worked and whether the pattern points to a wider problem that needs resources.
Can management review be held remotely?
In Sterling's view, yes, provided attendance, the inputs presented and the decisions are recorded in the same way. Confirm your accreditation body has no rule of its own on this, and circulate the input pack beforehand, which matters even more when people are not in one room.
More ISO/IEC 17025 guides
Every guide in the ISO/IEC 17025 series is written for one question and links back to the hub for the whole picture.
- ISO/IEC 17025 accreditation process, step by step
- ISO/IEC 17025 accreditation cost: what moves the price
- ISO/IEC 17025 documentation: what you need
- Effivity for ISO/IEC 17025: the guide
- ISO 17025 accreditation in India
- ISO/IEC 17025 internal audit: the technical clauses
- ISO 9001 vs ISO/IEC 17025: what accreditation adds
- Measurement uncertainty under ISO/IEC 17025: a budget you can defend
- Method verification and validation under ISO/IEC 17025
- ISO 17025 accreditation in the Netherlands and Europe
- ISO/IEC 17025 requirements explained, clause by clause
Keep exploring
Explore more about ISO/IEC 17025
Watch a video on how to implement ISO 17025 here.
Watch a video on ISO 17025 requirements here.
ISO/IEC 17025 resources
Services for ISO/IEC 17025
Talk to a consultant
Plan a laboratory management review that stands up at assessment.
Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.
hello@sterling-grc.com+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page
What would you like to achieve?
Choose a starting point. The enquiry form takes about a minute.
Book my free discovery callContinue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice