FSSC 22000 Version 7: what changed, the upgrade dates and how to prepare

Foundation FSSC published FSSC 22000 Version 7 on 1 May 2026, and upgrade audits run from 1 May 2027 to 30 April 2028. What changed, what stays the same, how the upgrade audit works and a five-step plan.

  • Updated September 2026
  • 8-minute read
  • Part of the FSSC 22000 hub

Key points

  • Foundation FSSC published FSSC 22000 Version 7 on 1 May 2026. Audits against Version 6 may be delivered up to 30 April 2027, upgrade audits to Version 7 run from 1 May 2027 to 30 April 2028, and Version 6 certificates still open after 30 June 2028 are set to withdrawn.
  • The biggest practical change is the prerequisite programme base: the retired ISO/TS 22002 technical specifications give way to the ISO 22002-x:2025 series, with ISO 22002-100:2025 as the common part used beside your sector part.
  • Version 7 also aligns the scheme with the GFSI Benchmarking Requirements v2024, gives the food chain categories a more defined structure and revises the additional requirements.
  • The upgrade audit is a full audit against Version 7, so the months before it are for a gap analysis, targeted rewrites and records that prove the new requirements work.

FSSC 22000 Version 7 dates: who must act, and by when

Every certified site needs an upgrade audit to Version 7 between 1 May 2027 and 30 April 2028. Until 30 April 2027 the certification body keeps auditing against Version 6, so the year after publication is a preparation window rather than an audit window. A site that misses the upgrade loses its listing: after 30 June 2028 the Foundation sets any remaining Version 6 certificate to withdrawn in the Assurance Platform, and it disappears from the public register that buyers check.

Sites seeking certification for the first time are caught by the same dates. From 1 May 2027 an initial certification is either Stage 1 and Stage 2 against Version 7, or a Stage 1 against Version 6 held before 1 May 2027 followed by a Stage 2 against Version 7.

DateWhat the Foundation's upgrade process setsWhat it means for your site
1 May 2026Version 7 scheme, annexes and upgrade-process document publishedObtain the documents, name an owner and start the gap analysis
30 April 2027Last day on which Version 6 audits may be deliveredAudits up to this date are to Version 6; use them to close old findings
1 May 2027 to 30 April 2028Upgrade audits against Version 7 are conductedAgree with your certification body when in the window yours falls
30 June 2028Remaining Version 6 certificates automatically set to withdrawnNo valid FSSC 22000 certificate without a completed upgrade

Why the Foundation revised the scheme

Version 6 dates from March 2023. Foundation FSSC gave four reasons for a new version. ISO had published a new series of prerequisite programme standards in 2025, and the scheme had to point to it. The Global Food Safety Initiative had issued version 2024 of its Benchmarking Requirements, which a recognised scheme must follow. The Foundation wanted to strengthen the requirements that help certified organisations contribute to the Sustainable Development Goals. And it wanted a clearer structure for dividing the food chain into categories. Editorial changes came with them.

Recognition itself is GFSI's decision, made through its own benchmarking process.

What changed in FSSC 22000 Version 7

The sources here are the Foundation's key-changes article of 7 May 2026 and the Version 7 scheme document, with a licensed certification body's release note adding the areas it saw revised.

AreaWhat Version 7 doesWhat to check on your site
Prerequisite programmesReplaces the ISO/TS 22002 technical specifications and the BSI PAS documents with the ISO 22002-x:2025 series: ISO 22002-100:2025 for requirements common to the food, feed and packaging chain, used with the part for your sectorEvery PRP procedure and inspection checklist that still cites the old specification
Food chain categoriesGives the categories a more defined structure, with sub-divisions below the existing subcategoriesWhether your scope wording still matches the category your products and processes fall into
GFSI alignmentAligns the scheme with the GFSI Benchmarking Requirements v2024, including auditor qualification requirementsMostly a certification-body matter; ask whether your usual auditor is qualified for Version 7
Packaging designIntroduces the Save Food Packaging design principles of the Australasian Institute of Packaging and the World Packaging Organisation for organisations that design packagingDesign and development records that show containment, protection, shelf life and food loss and waste were considered
Additional requirementsRevises the additional requirements, now eighteen topics; the certification body's note names food loss and waste, quality control, equipment management, allergen management, packaging design and food safety and quality cultureEach of those registers against the Version 7 text, not the Version 6 wording
Audit durationNamed among the changed areas; the certification body calculates duration under ISO 22003-1 plus the scheme's own componentThe duration and its calculation in your certification body's upgrade quote

The companion guide FSSC 22000 additional requirements explained, one by one covers each of the eighteen topics.

What stays the same

The architecture of the scheme holds. FSSC 22000 remains three normative parts: ISO 22000:2018 for the management system, a prerequisite programme standard for your category and the Foundation's additional requirements. The Version 7 text refers to ISO 22000:2018; ISO is preparing a third edition of ISO 22000 but has announced no publication date, so that is a later change, not part of this one.

The certification rules are set out again in the Version 7 scheme: Stage 1 and Stage 2 must fall within six months of each other, surveillance is a full system audit every calendar year, and at least one surveillance audit in each three-year cycle is unannounced. Farming remains outside the scheme, as it has been since Version 6 removed category A. Brokers and traders work to ISO 22000:2018 and the additional requirements with no prerequisite programme part.

A system that runs well under Version 6 needs updating, not rebuilding.

The upgrade audit: full scope, possibly unannounced

The upgrade audit is not a document review of the changes. The Foundation defines it as a full audit against the Version 7 requirements. It may be announced, or unannounced where the site still needs its unannounced audit to meet the three-yearly rule, so plan for the possibility that the upgrade happens on a day you did not choose. The guide The unannounced audit: how to be ready on any day explains how that visit runs.

The Foundation specifies no additional audit time for the upgrade, but a certification body may add time where it judges it necessary. Ask for the calculation, and book early: every certified site works to the same twelve months.

Findings are graded minor, major or critical, as at any scheme audit, and a site should leave room to close them before 30 June 2028.

An upgrade plan in five steps

Step 1: read the scheme documents and run a gap analysis

Compare your system with the Version 7 scheme, annexes and main-changes document, starting with the prerequisite programmes and the revised additional requirements. Sort each result as met with evidence, met without evidence, or not met.

Step 2: rewrite the prerequisite programmes to the 2025 standards

Map every PRP to ISO 22002-100:2025 and your sector part, and revise the inspection checklists used for PRP verification so the site is checked against the new text.

Step 3: update the scope and the additional requirement registers

Confirm your category under the new structure, then revise the food loss and waste, quality control, equipment, allergen, packaging design and culture records the changes touch. Keep what already works.

Step 4: train, audit and review against Version 7

Brief the food safety team and internal auditors on the changes, then complete an internal audit of all three parts and a management review with the new requirements on the agenda. FSSC 22000 training: who needs what sets out the roles.

Step 5: book the upgrade audit early

Agree the date range, the audit duration and the handling of the unannounced audit with a certification body licensed by Foundation FSSC.

How Sterling handles FSSC 22000 Version 7 upgrades

An upgrade that changes what Version 7 requires and nothing else.

Our expert and experienced consultants run the gap analysis against the Version 7 documents, rewrite your prerequisite programmes to ISO 22002-100:2025 and your sector part, update the additional requirement registers in Effivity, brief your team and complete the internal audit and management review with you, so the upgrade audit finds a system already working to Version 7 on any day. Upgrades are part of Sterling's Sustain™ support. We ensure successful certification for our clients. Your licensed certification body audits and decides; Sterling does not certify.

Book a free discovery call

FSSC 22000 Version 7: questions buyers ask

Can we have our upgrade audit to Version 7 before May 2027?

No, going by the Foundation's timetable. Version 6 audits may be delivered up to 30 April 2027 and upgrade audits run from 1 May 2027, so the earlier months are for preparing the site, not for the audit itself.

Do we have to rewrite our prerequisite programmes for Version 7?

Yes, in most cases. Version 7 bases the PRPs on ISO 22002-100:2025 together with the 2025 part for your sector, so procedures and checklists written to the old technical specifications need remapping. Brokers and traders are the exception, because their category has no PRP part.

Will the upgrade audit take longer than a normal surveillance audit?

Not by the Foundation's rules, which specify no extra time for the upgrade. Your certification body may still add time where it considers it necessary, so ask it for the calculation.

We are starting FSSC 22000 certification in early 2027. Which version applies?

Build to Version 7. From 1 May 2027 a first certification is audited to Version 7, either at both stages or at Stage 2 after a Version 6 Stage 1 held before that date.

What happens if our upgrade audit slips past the window?

The certificate lapses. Upgrade audits end on 30 April 2028, and after 30 June 2028 the Foundation sets every remaining Version 6 certificate to withdrawn, which removes it from the public register your customers check.

Does Version 7 bring farming back into the scheme?

No. Farming has been outside FSSC 22000 since Version 6 removed category A, and ISO lists the farming technical specification in the 22002 series as withdrawn.

FSSC 22000 implementation

FSSC 22000 requirements

Get the document

We e-mail the document as a PDF link. Tell us who you are and where to send it.

A quick security check confirms the request comes from a person.

By requesting the document you agree to our privacy notice. Sterling uses these details to send it and to respond to your request. We never sell your data.

Talk to a consultant

Upgrade your FSSC 22000 certificate to Version 7 before the window closes.

Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.

hello@sterling-grc.com

+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page

What would you like to achieve?

Choose a starting point. The enquiry form takes about a minute.

Your goal
Book my free discovery call

Continue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice