hello@sterling-grc.com +1 201 263 4443 New York ISO & GRC consulting in 60+ countries
SterlingInternational Consulting Talk to a consultantTalk to us
← ISO/IEC 27001 hub

ISO/IEC 27001 guide

ISO/IEC 27001 Stage 1 and Stage 2 audits: what auditors check, day by day

Clause by clause: ISO/IEC 27001:2022 requirements: every clause explained →

Stage 1 decides whether your ISMS is ready to be audited; Stage 2 tests whether its controls work. What auditors examine first, how evidence is sampled across systems, sites and cloud platforms, how findings are raised and who takes the certification decision.

  • Updated September 2026
  • 8-minute read
  • Part of the ISO/IEC 27001 hub

Key points

  • At Stage 1, its readiness review, the certification body checks scope, risk method, Statement of Applicability, internal audit and management review; Stage 2 tests whether controls operate and objectives are met.
  • Auditors usually start with the chain from risk to control: register, treatment plan, Statement of Applicability and records must agree.
  • Stage 2 samples evidence across systems and sites; cloud platforms are usually examined by screen share, under arrangements agreed beforehand.
  • Every finding cites a requirement and its evidence. The audit team recommends; people at the certification body who took no part in the audit decide.

Stage 1: the readiness review

ISO/IEC 17021-1, the standard to which certification bodies are accredited, requires two audit stages for initial certification; ISO/IEC 27006-1 adds ISMS-specific rules. For an ISMS, the Stage 1 objectives point to seven things the auditor will want to see.

  • Scope: the statement, sites, cloud platforms and interfaces with clients, suppliers and group functions.
  • Obligations and policy: identified legal, regulatory and contractual security requirements; an approved policy with measured objectives.
  • Risk method: criteria for assessing and accepting risk, and a process whose repeated assessments give consistent, valid and comparable results (clause 6.1.2).
  • Risk results: the register and a treatment plan approved by risk owners, residual risk accepted.
  • Statement of Applicability: all 93 Annex A controls addressed, each decision justified, status matching the plan.
  • Internal audit and management review: planned and performed, so bring reports and minutes, not a calendar.
  • Conditions: premises, remote working and systems in scope, which shape how much of Stage 2 can be remote.

The conclusions record your readiness and any concerns that could become Stage 2 nonconformities. You are told beforehand which Stage 1 activities need a visit, the interval must allow for fixing concerns, and Stage 2 arrangements may change. The auditor records concerns, not remedies: a readiness review is not a gap analysis, Sterling's first engagement stage. See choosing an ISO/IEC 27001 certification body and the certification process guide.

What ISMS auditors look at first

After the opening meeting and a leadership interview, most ISMS auditors lay the risk register beside the Statement of Applicability before sampling any control. The ISMS is a chain from scope to risks, treatment, controls and records, and a weak early link undermines every later one. Expect four tests.

  • Forwards: a high risk followed to its treatment, its controls and the records showing them at work.
  • Backwards: a control marked implemented traced to the risk or requirement it answers.
  • Sideways: exclusions compared with reality; a company that writes its own software will struggle to exclude secure development.
  • Over time: the last risk assessment dated against significant changes since, because clause 8 requires reassessment at planned intervals and when significant changes are proposed or occur.

Leaders should be able to name the risks they accepted.

Stage 2: are the controls operating?

At Stage 2 the auditor judges whether the ISMS is implemented and effective. Under ISO/IEC 17021-1 that spans every requirement in scope, including performance against objectives, legal and contractual compliance, operational control, internal audit and management review. Annex E of ISO/IEC 27006-1 guides the review of implemented controls. In most ISMS audits, these areas draw the closest sampling.

Control area (Annex A)What the auditor samplesWhat makes it fail
Access (A.5.15 to A.5.18, A.8.2, A.8.5)Leavers and movers from HR records, traced into the identity provider and applications; privileged accountsAn account active after its owner left; administrator rights nobody can justify
Change (A.8.32)Changes from the ticketing or deployment history, emergencies includedChanges released without approval or testing
Logging and monitoring (A.8.15, A.8.16)Log sources, retention settings, alerts and responsesLogs collected but never reviewed; alerts without an owner
Suppliers and cloud (A.5.19 to A.5.23)Suppliers from the register, security clauses in contracts, cloud provider assessmentsA critical provider never assessed; everyday tools missing from the register
Incidents (A.5.24 to A.5.28)Events and incidents, from triage to lessons learnedAn empty log in a busy organisation; incidents closed without a cause
Continuity and backup (A.5.29, A.5.30, A.8.13)Continuity arrangements, the last exercise, restore testsA plan never exercised; backups never restored

Auditors work from samples, corroborated by interview, observation and records, as ISO/IEC 17021-1 requires. In an ISMS the population is usually a system export, such as users or changes, and good trails cross systems: HR record, identity provider, then each application. A completed access review shows implementation; revoked accounts show effectiveness. For several sites, the multi-site sampling rules in ISO/IEC 27006-1 decide whether sites may be sampled. Typical questions are in our audit questions guide.

Remote auditing of cloud environments

Cloud platforms are normally audited by screen share, and the 2024 edition of ISO/IEC 27006-1 was revised throughout for remote audits and organisations with few or no relevant physical sites. IAF MD 4, numbered TECH-3-003 under Global ACI, requires both sides to agree the technology before use, in line with information security and data protection measures; otherwise the auditor must use other methods. The audit plan shows how, and how far, it will be used. The same rules recognise a virtual site, an online working environment, but never for processes that need a physical place.

  • You drive, the auditor chooses: your administrator shares the console and opens whatever the auditor names; prepared screenshots count for less.
  • No standing access: auditors rarely need their own accounts; any agreed read-only access should be limited and removed afterwards.
  • The provider's share: your certification body does not audit the provider's data centres; under A.5.23 it asks how you assessed the provider and which controls remain yours.

Physical controls at your offices are usually still seen in person.

A typical ISMS Stage 2, day by day

Audit days come from the certification body's calculation under ISO/IEC 27006-1 (scope, headcount, locations; see the cost guide). This illustration assumes three days, one auditor, one office and cloud platforms reviewed remotely; your real plan, naming the auditors, arrives in advance.

WhenWhat is auditedWho is neededEvidence sampled
Day 1, startOpening meeting: the plan, remote-session tools and confidentiality agreedTop management, ISMS lead, process ownersAnything changed since Stage 1
Day 1, restContext, leadership, objectives, risk method, Statement of ApplicabilitySenior managers, ISMS lead, risk ownersHigh risks traced to controls; Stage 1 concerns closed
Day 2, morningIdentity and access in the identity provider, cloud console and key applicationsIT or cloud administrators, HRLeavers, movers, privileged accounts, access reviews
Day 2, afternoonChange, vulnerabilities, logging, monitoring, backupEngineering and operations leadsTickets, scan and patch records, alerts, restore tests
Day 3, morningPeople, physical security, suppliers, incidents, continuityHR, facilities, supplier owner, security leadScreening and awareness records, office walk-through, supplier assessments, incident files
Day 3, middayInternal audit, management review, corrective action, measurementISMS lead, internal auditorAudit reports, review minutes, metrics
Day 3, afternoonFindings finalised; closing meetingTop management, process ownersFindings, grades, deadlines, recommendation

How findings are raised, and who decides

Each nonconformity names the requirement breached, states what is wrong, cites objective evidence and is discussed with you. Cause and remedy stay yours: the auditor may propose neither. A major nonconformity is one that affects the ISMS's capability to achieve its intended results; a minor one leaves it intact. A control your Statement of Applicability declares implemented but which is not operating is a nonconformity, so the finding usually names both the control and the requirement. Closure is covered in our nonconformities guide.

The closing meeting gives the conclusions and recommendation, reminds you the evidence was a sample and sets the deadline for your correction and corrective action plan. Competent people at the certification body with no part in the audit then decide, once corrections and corrective actions for every major nonconformity are reviewed, accepted and verified, and plans for minor ones accepted. A major still unverified six months after the final Stage 2 day means another Stage 2 before certification can be recommended. The decision opens a three-year cycle; see our surveillance and recertification guide.

How Sterling prepares you for the certification audit

Every significant risk traced to a live record before the auditor asks.

Sterling's expert and experienced consultants trace your significant risks through the treatment plan and Statement of Applicability to working evidence, and run the internal audit and management review with your team. Records sit in Effivity, included with the engagement at no additional cost, ready for any sample the auditor names. We ensure successful certification for our clients. Sterling does not certify: the independent, accredited certification body audits and takes the decision.

Book a free discovery call

ISO/IEC 27001 Stage 1 and Stage 2: questions buyers ask

Will the auditor need access to our production systems or client data?

Rarely: administrators show evidence on screen. If contracts stop you showing some records, tell the certification body before the audit so it can decide how to assess those controls.

Our systems are all cloud-hosted. What will the auditor visit?

Perhaps one office, perhaps nothing physical at all. Laptops, home working and people controls still need evidence, and the audit plan says which activities are remote.

What happens if Stage 1 concludes we are not ready?

The report lists the concerns, and the Stage 2 date must allow time to resolve them. Moving Stage 2 beats arriving with a known gap.

Can the Statement of Applicability change between Stage 1 and Stage 2?

Yes, if the change comes from your risk process and is approved. Tell the certification body: Stage 2 audits the current version and the auditor will ask why it changed.

Can we fix a problem while the auditor is still on site?

Yes, but expect the finding to be recorded anyway, since the report reflects the evidence at the time. The correction helps; the cause still needs corrective action.

ISO/IEC 27001 implementation

ISO/IEC 27001 requirements

Get the document

We e-mail the document as a PDF link. Tell us who you are and where to send it.

A quick security check confirms the request comes from a person.

By requesting the document you agree to our privacy notice. Sterling uses these details to send it and to respond to your request. We never sell your data.

Talk to a consultant

Plan your ISO/IEC 27001 certification with confidence.

Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.

hello@sterling-grc.com

+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page

What would you like to achieve?

Choose a starting point. The enquiry form takes about a minute.

Your goal
Book my free discovery call

Continue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice