How certification bodies grade ISO 22000 nonconformities as major or minor, how a finding is written, correction versus corrective action with root cause, seven real food safety findings with their fixes, timescales and how closure is verified.
Key points
- ISO 22000 nonconformities are graded by the certification body under ISO/IEC 17021-1: major when the food safety management system can no longer be relied on to achieve its intended results, minor when it can.
- In food, the grade follows the hazard: a missing CCP record or an unvalidated control measure weighs far more than an out-of-date document list.
- ISO 22000 separates corrections, which deal with the product and the event, from corrective actions, which remove the cause so it does not recur.
- Response deadlines are set by each certification body; the one fixed limit is that a major left unverified for six months after Stage 2 means repeating Stage 2.
What is a major and a minor nonconformity in ISO 22000?
A nonconformity is an unmet requirement of ISO 22000, of applicable law or of your own procedures. Accredited certification bodies classify each one using the concepts in ISO/IEC 17021-1, applied to food safety through ISO 22003-1.
A major nonconformity is one that affects the capability of the system to achieve its intended results, which in a plant means delivering safe product. Auditors grade a finding major when there is significant doubt that a process is under effective control, or when several minors against the same requirement show that the failure is systemic rather than a slip. A minor nonconformity is a genuine lapse that does not, on its own, put that capability in doubt.
Food auditors read severity through the hazard. A late cleaning signature in a dry store is rarely more than a minor. A metal detector running without its start-of-shift check, or a cooking step whose critical limit was never validated, goes to the heart of hazard control and is likely to be raised as a major. Opportunities for improvement need no formal answer. FSSC 22000 adds a critical grade; the HACCP, ISO 22000 and FSSC 22000 comparison covers the scheme.
How an ISO 22000 finding is written
Every finding has three parts:
- The requirement: for example, the standard's requirement that monitoring and measuring equipment is calibrated or verified at specified intervals, together with the plant's own calibration schedule.
- The objective evidence: the probe thermometer used to monitor the cooking CCP on line 2 carried no calibration record for the last five months; its reading differed from the reference thermometer by more than the tolerance the plant had set.
- The statement: the organisation could not show that the equipment used to monitor a CCP gives valid results.
The auditor discusses each finding with you before the closing meeting, so a record that exists but was not found during the audit should be produced at that point. Auditors do not propose the cause or the fix; that work is yours. Disputed grades go to the body's appeals process.
Correction, root cause and corrective action
ISO 22000 deals with nonconformity in two places. Clause 8.9, Control of product and process nonconformities, covers what happens on the line, including corrections, corrective actions and the handling of potentially unsafe product. Clause 10.1, Nonconformity and corrective action, covers the system as a whole. A certification finding usually needs both. Taking the thermometer finding above:
Correction: deal with the product and the instrument
Withdraw the thermometer, check it against the reference, and assess every batch cooked since the last known good calibration. Where the error could have let product pass below the critical limit, treat those batches as potentially unsafe product: hold, evaluate and, if any have left site, decide on withdrawal.
Root cause: why the control failed
The replacement probe was never added to the equipment register, so the calibration reminder never fired. Then ask whether other devices sit outside the register.
Corrective action: change the system
Tie the register to purchasing so that no monitoring device enters use without an identity and a calibration date, check every instrument against the register, and add a pre-use check at the CCP. Effectiveness is shown when the next two calibration cycles run on time. Replacing the probe alone is only a correction, and it invites the same finding at surveillance.
Examples of real food-safety nonconformities
The rows below are composites drawn from typical food safety audits, not extracts from any client report. The grade shown is the usual one for an isolated case; the certification body grades each finding on its own evidence.
| What the auditor found | Requirement and usual grade | Correction | Corrective action |
|---|---|---|---|
| Pest control bait stations on the site plan missing in the warehouse; contractor reports not reviewed | PRPs, clause 8.2 Minor; major if pest activity is found in production | Reinstate the stations; inspect for activity; review the reports | Site plan reconciled at each visit; reports reviewed and trended by the food safety team |
| Metal detector start-of-shift checks blank on six night shifts | Hazard control plan, monitoring at a CCP Major | Hold and re-inspect the affected product; retest the detector | Line cannot start until the check is recorded; supervisor verification each shift |
| CCP chilling records completed in the same pen and hand at the end of the shift | Hazard control plan, monitoring records Major if records cannot be trusted | Evaluate product from the affected shifts | Records made at the time, on the line; monitors retrained; spot checks by verifiers |
| Pasteurisation time and temperature copied from a supplier guide, never validated for the plant's product | Validation of control measures, clause 8.5 Major | Obtain validation evidence before further reliance | Validation required before any control measure enters the plan and after change |
| Recall procedure written, but never tested; a traceability trace took two days | Withdrawal and recall, clause 8.9; traceability, clause 8.3 Minor; major if trace cannot be completed | Run and time a mock recall now | Mock recalls on a schedule, with a target time and reconciliation of quantities |
| Environmental swab results filed, but a rising Listeria-species trend never analysed | Verification and analysis of results, clause 8.8 Minor; major if positives in food-contact zones were ignored | Review the results; intensify sampling and cleaning | Verification results trended monthly and reported to management review |
Timescales and how closure is verified
At the closing meeting the audit team states the deadline for your analysis and plan; the certification body sets it, so ask for it in writing. In typical practice bodies expect majors to be evidenced faster than minors, but periods differ between bodies and schemes, so rely on your body's rules, not a general figure.
The body reviews your response and decides how to verify it: through documented evidence, a short follow-up visit, or a check at the next audit. Majors are verified before the certification decision; for minors, an accepted plan is normally enough, with implementation checked at surveillance. Good closure evidence shows the corrected process running after the audit:
- records dated after the audit, such as completed CCP sheets, calibration certificates or a timed mock recall report;
- the revised procedure, form or hazard analysis, with its approval and version;
- for effectiveness, a run of results rather than one good day.
What happens when a major stays open
Before a first certificate, no certification decision can be taken while a major is unverified, and if verification runs beyond six months from the last day of Stage 2, Stage 2 must be repeated. Later, an unclosed major can lead to suspension, when the certificate cannot be used with customers, then withdrawal or a reduced scope. At recertification, a major must be closed before expiry or the certificate is not renewed on time. The surveillance and recertification guide sets out the full three-year cycle.
How to avoid the common food-safety findings
Most findings above involve records that exist only after weeks of operation, which no one can create the week before the audit. Let your internal audit observe PRPs and the plan on the floor, and use the certification body's Stage 1 readiness review, described in the Stage 1 and Stage 2 guide, to hear about areas of concern early. The ten failures we see most often are in the common mistakes guide.
How Sterling helps close food-safety findings
Found by us first, answered with evidence the body can verify.
Sterling's expert and experienced consultants audit your PRPs, hazard control plan and records before the certification body arrives, so most findings are closed before Stage 2. If a nonconformity is still raised, we work through the root cause with your food safety team and help prepare a response that shows the corrected process running. Corrective actions and their evidence are held in Effivity, included with the engagement, at no additional cost. We ensure successful certification for our clients. Sterling does not certify: the accredited certification body grades every finding and makes the decision.
Book a free discovery callISO 22000 nonconformities: questions buyers ask
Can we still get ISO 22000 certification with a major nonconformity?
Yes, once it is closed. The certification body will not decide while a major is open, but after it has verified your correction and corrective action, certification can proceed, provided this happens within six months of the last day of Stage 2.
How many minor nonconformities are allowed at an ISO 22000 audit?
There is no fixed number in the rules. Minors need an accepted action plan, but several minors against one requirement can be combined into a major because together they suggest the process is not under control.
Is a customer complaint or a product withdrawal automatically a nonconformity?
No. A complaint or a withdrawal handled through your procedures, investigated and acted on shows the system working. The finding arises when the event was not recorded, not investigated, or not used to review the hazard analysis.
Who should write the root cause analysis for a food safety finding?
The people who own the process, led by the food safety team. The team leader coordinates, but the line supervisor, maintenance or quality staff involved know why the control failed; an analysis written alone in an office tends to stop at "human error".
Do nonconformities from a customer or regulatory inspection count at the certification audit?
They are not certification findings, but auditors often ask to see them. Clause 10.1 applies to nonconformities from any source, so show that inspection findings were analysed and closed like any other.
More ISO 22000 guides
Every guide in the ISO 22000 series is written for one question and links back to the hub for the whole picture.
- ISO 22000 certification cost: what moves the price
- ISO 22000 certification process, step by step
- Effivity for ISO 22000: the guide
- HACCP vs ISO 22000 vs FSSC 22000: which one, and when
- Hazard analysis, OPRPs and CCPs: the hazard control plan
- ISO 22000 internal audit: PRPs and the hazard control plan
- ISO 22000 management review
- ISO 22000 certification in the Netherlands and Europe
- Prerequisite programmes and ISO 22002-1: what a plant needs
- ISO 22000 requirements explained, clause by clause
- ISO 22000 for retail and wholesale
- ISO 22000 training: who needs what, and the competence evidence
Keep exploring
Explore more about ISO 22000
Watch a video on how to implement ISO 22000 here.
Watch a video on ISO 22000 requirements here.
ISO 22000 resources
Services for ISO 22000
Talk to a consultant
Close food safety findings before the certification body raises them.
Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.
hello@sterling-grc.com+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page
What would you like to achieve?
Choose a starting point. The enquiry form takes about a minute.
Book my free discovery callContinue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice