What top management must review in a food safety management system, how often and with whom, a sample quarterly agenda, how the review feeds the food safety team's system updating, and the record a certification body will ask to see.
Key points
- An ISO 22000 management review is top management's planned evaluation of whether the food safety management system is still suitable, adequate and effective. It has to end in decisions, and those decisions have to be recorded.
- The inputs are food-specific: what the food safety team changed when it updated the system, what verification of the PRPs and the hazard control plan showed, what came in from customers and regulators, and any emergency, incident, withdrawal or recall.
- The outputs feed straight back into the system: improvement actions, changes to the FSMS, resources, and any revision of the food safety policy and objectives.
- Auditors ask for the minutes, the data that was presented and proof that the actions were carried out. A review that only notes information is the most common weakness they find.
What an ISO 22000 management review is for
ISO 22000 places the management review in clause 9, beside monitoring, analysis and internal audit. Its purpose is narrow and demanding: the people who control money, staffing and priorities look at the evidence the food safety system has produced and decide whether it still does its job. The team prepares the evidence; top management weighs it and commits.
In food the distinction matters: a new metal detector, a revalidated cooking step or a supplier dropped after allergen deviations are calls only management can make, and the standard expects to see that it made them.
The inputs: what management must see
ISO 22000 adds food-specific inputs to the usual management system set. Group them into four blocks so the meeting does not become a reading of numbers.
System status and change
Start with the status of actions from the previous review, then the changes in external and internal issues since the last meeting: new products, new lines, new customers, new legislation, a change of ownership or site. The results of the food safety team's system updating activities sit here too, because they show what has already been changed in the hazard analysis, the PRPs and the hazard control plan, and why.
Performance of controls
This is the core of a food safety review. Management should see trends, not single results, in monitoring and measurement, in the analysis of verification activities for the PRPs and the hazard control plan, in nonconformities and corrective actions, and in the results of internal and external audits and inspections, including customer and regulatory visits. Add the performance of external providers, the progress against FSMS objectives, and the review of risks and opportunities with a judgement on whether the actions taken on them worked.
Events and communication
Any emergency situation, incident, withdrawal or recall since the last review belongs on the agenda, with what happened, how quickly it was contained and what the investigation found. So does the relevant information from external and internal communication: customer complaints and requests, feedback from authorities, alerts from suppliers or the sector, and the changes the food safety team was told about by production, engineering and purchasing.
Resources and improvement
Close with the adequacy of resources, meaning people, competence, infrastructure, laboratory capacity and time, and with the opportunities for continual improvement the evidence has revealed.
The outputs: what the review must decide
The output of an ISO 22000 review is a set of decisions and actions. They fall into two groups. The first is continual improvement: which opportunities will be pursued, by whom and by when. The second is change to the system itself: updates to the FSMS, the resources needed to carry them out, and any revision of the food safety policy and the FSMS objectives. Documented information on the results must be retained.
Good outputs are specific: "improve allergen control" is a wish; "revalidate the line 3 changeover clean with protein swabs, production manager, by month end, budget approved" is a decision. Each output should have an owner, a date and, where money or people are involved, an explicit approval.
How often, and who attends
The standard requires planned intervals and leaves the frequency to you. Once a year is the minimum an auditor will accept for a stable operation; most plants find a quarterly review works better, because verification trends, complaints and supplier performance change faster than an annual cycle can follow. Add an extra review after a recall, a serious incident or a major change to products or premises.
Top management must attend, and must be the people who can commit resources: the general manager or plant director, not a delegate without budget authority. The food safety team leader presents the evidence. Production, engineering or maintenance, quality or laboratory, purchasing and, where relevant, sales or customer service should be present for the items they own.
A sample agenda for a quarterly review
A ninety-minute meeting for a single-site plant. Adjust the times, not the order.
| Agenda item | What is presented | Presented by | Time |
|---|---|---|---|
| Actions from the last review | Open, closed and overdue actions, with evidence of closure | Food safety team leader | 10 min |
| Changes in context and system updating | New products, lines, suppliers or legislation; changes made to the hazard analysis, PRPs and hazard control plan | Food safety team leader | 10 min |
| PRP and hazard control plan performance | Trends in CCP and OPRP monitoring, deviations, verification analysis, swab and product testing | Quality or laboratory lead | 20 min |
| Audits, inspections and suppliers | Internal audit results, customer and regulatory visits, external provider performance | Internal audit lead, purchasing | 10 min |
| Communication and events | Complaints, customer and regulator feedback, any emergency, incident, withdrawal or recall, mock recall results | Quality, customer service | 15 min |
| Objectives, risks and resources | Progress on FSMS objectives, effectiveness of actions on risks and opportunities, resource gaps | Food safety team leader, production | 10 min |
| Decisions | Improvement actions, FSMS changes, resources, policy and objective revisions, each with owner and date | General manager | 15 min |
How the review links to the food safety team's system updating
ISO 22000 expects the food safety management system to be updated as knowledge and circumstances change, and it gives the food safety team a central role in that work under clause 10. The team takes in what it learns through internal communication, verification analysis, audits, corrective actions and the review's own outputs, and updates the hazard analysis, the PRPs and the hazard control plan accordingly.
The loop runs in both directions. The results of the team's updating activities are an input to the review, so management sees what has changed and why. The review's decisions are then an input to the next round of updating, so the team knows what it must change and with what resources. When auditors test this loop, they pick one review decision and follow it into a revised document, a new validation record or a changed monitoring frequency. If the trail stops at the minutes, the loop is broken. The hazard control plan guide and the internal audit guide cover those activities in depth.
The record auditors ask for
A certification body's auditor will normally ask for the last one or two reviews and read them against the rest of the system. Expect them to look for the following: the date and the attendees, showing that top management was present; the input data itself, or a reference to where it is held, not only a summary; evidence that every required input was considered, including events and communication; the decisions, with owners and dates; and proof that the decisions were carried out, found in later documents and records.
Auditors also compare the review with the floor: a review calling CCP performance satisfactory beside repeated deviations in the monitoring records puts the review itself in question.
How Sterling prepares the review
A management review that decides, recorded where the auditor will look.
Sterling's expert and experienced consultants set up the review with your food safety team leader and top management: the input pack, the agenda and the outputs log. With Design™ (guided), your team runs it with Sterling's structure and coaching; with Drive™ (managed), Sterling consultants prepare the evidence pack and facilitate the meeting with you. Either way the inputs, minutes and actions live in Effivity, used in 50+ countries and included with the engagement, at no additional cost. We ensure successful certification for our clients. The certificate is issued by an independent, accredited certification body; Sterling does not certify.
Book a free discovery callWhat a weak management review looks like
- Held by the wrong people. The food safety team reviews itself and sends minutes to the general manager afterwards.
- Numbers without trends. Monitoring results are listed month by month with no target, no direction and no interpretation.
- Events left out. A customer complaint about a foreign body or a withdrawal is missing because it was "handled at the time".
- No decisions. The outputs say "noted" or "continue to monitor" against every item.
ISO 22000 management review: questions buyers ask
Can the management review be combined with our monthly food safety meeting?
Yes, provided top management attends, every required input is covered over the planned cycle and the minutes show decisions. The record must make clear which meeting served as the review.
Do we need a review before the Stage 1 audit?
The certification body will expect at least one completed review before the Stage 2 audit, and Stage 1 normally checks that it is planned or done. Hold it once the system has produced enough monitoring and verification records to review.
Can one review cover ISO 22000 and ISO 9001 together?
It can, if the inputs specific to food safety are presented and decided on separately within the meeting. Verification of the PRPs and the hazard control plan, incidents and recalls must not be absorbed into general quality indicators.
Must the minutes be signed?
The standard requires documented information on the results, not a signature. An approval by the general manager, on paper or in software, is good practice because it shows who owns the decisions.
What if nothing went wrong this quarter?
Record that, with the evidence behind it. The review still has to conclude on suitability and resources, and a quiet quarter is a good time to approve improvement work.
More ISO 22000 guides
Every guide in the ISO 22000 series is written for one question and links back to the hub for the whole picture.
- ISO 22000 certification cost: what moves the price
- ISO 22000 certification process, step by step
- Effivity for ISO 22000: the guide
- HACCP vs ISO 22000 vs FSSC 22000: which one, and when
- Hazard analysis, OPRPs and CCPs: the hazard control plan
- ISO 22000 for food ingredients, additives and supplements
- Integrating ISO 22000 with ISO 9001 and ISO 14001
- ISO 22000 internal audit: PRPs and the hazard control plan
- ISO 22000 certification in the Netherlands and Europe
- ISO 22000 nonconformities
- Prerequisite programmes and ISO 22002-1: what a plant needs
- ISO 22000 requirements explained, clause by clause
Keep exploring
Explore more about ISO 22000
Watch a video on how to implement ISO 22000 here.
Watch a video on ISO 22000 requirements here.
ISO 22000 resources
Services for ISO 22000
Talk to a consultant
Set up an ISO 22000 management review that leads to decisions.
Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.
hello@sterling-grc.com+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page
What would you like to achieve?
Choose a starting point. The enquiry form takes about a minute.
Book my free discovery callContinue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice