hello@sterling-grc.com +1 201 263 4443 New York ISO & GRC consulting in 60+ countries
SterlingInternational Consulting Talk to a consultantTalk to us
← ISO 22000 hub

ISO 22000 guide

ISO 22000 internal audit: how to audit PRPs and the hazard control plan

Clause by clause: ISO 22000 clause 9.2: audit the food safety system for useful evidence →

How to audit your own food safety management system: a programme weighted by risk, auditors who are independent and know food technology, PRPs observed on the floor, the hazard control plan tested against its limits, sampling, reporting and follow-up.

  • Updated September 2026
  • 8-minute read
  • Part of the ISO 22000 hub

Key points

  • An ISO 22000 internal audit tests two things at once: whether the management system is followed, and whether the controls that keep food safe work on the line, on every shift.
  • Weight the programme by risk: areas with critical control points, allergens, open product or a history of findings are audited more often than a finished-goods store.
  • Prerequisite programmes are audited by watching production and cleaning; the hazard control plan by comparing monitoring records with the limits and following every deviation.
  • Internal auditors never audit their own work and need enough food technology knowledge to judge a hazard, not only a form.

What ISO 22000 expects from an internal audit

To audit yourselves under ISO 22000, you run a planned programme of audits, carried out by people who do not audit their own work, that checks both the food safety management system and the operational controls in the plant, reports the results to the food safety team and management, and follows every finding to an effective correction. The requirement sits in clause 9, performance evaluation, beside monitoring, analysis and management review.

The method comes from ISO 19011, the guidance on auditing management systems, whose current edition was published in 2026 and replaced the 2018 edition. ISO 22000 adds what makes a food safety audit different: the auditor has to understand hazards, limits and the physical conditions of a plant well enough to see when a record says one thing and the floor says another.

The programme: frequency weighted by risk and past results

The programme is the plan for the year: which areas and requirements are audited, when and by whom. Every part of the scope is covered within the cycle, but not with equal attention. Three questions set the frequency. How severe is the hazard if this control fails? CCPs, allergen handling, ready-to-eat product and high-care zones come first. What did earlier audits, complaints, verification results and inspections find? Repeated findings bring an area back sooner. What has changed? A new line, product, supplier or shift pattern moves the area forward, because the hazard analysis and PRPs may not have kept up.

A common pattern is to audit high-risk production areas and the hazard control plan more than once a year, and purchasing, document control and training once. Night and weekend shifts, sanitation crews and contracted cleaning or pest control belong in the programme, because failures often happen when the day team is absent. Record the reasoning; a certification auditor will ask why an area with poor verification results was audited only once.

Who audits: competence and independence

Independence means nobody audits work they perform, supervise or wrote the procedure for. The supervisor who signs the metal detector checks does not audit that line; whoever built the HACCP study does not audit the hazard analysis. Small plants manage this by cross-auditing, with an external auditor for any area nobody inside can audit impartially.

Competence has two parts. Audit skill: planning, interviewing, sampling and writing a finding that states the requirement, the evidence and the gap. Food technology knowledge: microbiological, chemical, physical and allergen hazards, how cooking, chilling or metal detection controls them, what a validated limit means and what hygienic design looks like. Without the second, an auditor can confirm a form is signed but not whether the limit on it makes sense. The competence evidence is covered in ISO 22000 training: who needs what, and the competence evidence.

Auditing prerequisite programmes on the floor

PRPs are the basic hygienic conditions: cleaning and sanitation, pest control, personal hygiene, maintenance, water, waste, allergen management, zoning and the state of the building. A cleaning log can be complete while the underside of a conveyor still carries yesterday's residue, so records alone prove little.

Audit PRPs by observation, during production and during cleaning. Watch whether the handwashing and changing sequence into high care is followed without prompting. Stand at a changeover from an allergen-containing product and watch the clean-down and the check that releases the line. Attend a sanitation shift and compare chemical concentration and contact time with the procedure. Look up, behind and under equipment: condensation over open product, flaking paint, gaps under doors, bait stations blocked by pallets. Then take that shift's records and see whether they describe what you watched. Which PRPs apply is explained in Prerequisite programmes and ISO 22002-1: what a plant needs.

Auditing the hazard control plan

How the plan is built belongs to Hazard analysis, OPRPs and CCPs: the hazard control plan; the internal audit tests whether it runs. Four checks do most of the work.

Monitoring records against limits

Compare sampled monitoring values with each critical limit or action criterion. Look for entries written at the end of the shift, identical values all day, readings at a different frequency from the plan, and blank lines.

Corrections and product disposition

For every value outside a limit, follow the trail: was control restored, was affected product identified and held, and was the release or disposal decision recorded by someone authorised to make it?

Calibration of monitoring devices

A probe that reads high makes every cooking record unreliable. Check that CCP and OPRP devices are calibrated or verified at the planned interval against a traceable reference, and that product was assessed when a device was found out of tolerance.

Verification

Confirm that second-person record reviews, metal detector test pieces, environmental swabs and product testing took place, and that someone analysed the results and acted on trends.

Sampling, area by area

Choose samples that can reveal a problem: different shifts and products, days with deviations or complaints, the first batch after a changeover, the busiest period. Trace one lot forward from delivery to dispatch and one backwards from finished product to suppliers.

AreaWhat to observeWhat to sampleTypical finding
ReceivingTemperature and vehicle checks at the dockReceiving records, supplier approval statusChilled goods accepted with no recorded temperature
Cleaning and sanitationA cleaning shift through to releaseCleaning records, pre-start checks, swab resultsSigned as clean with residue on contact surfaces
Allergen controlA changeover, storage segregationRelease records, label checksLine released without the documented check
CCP, such as cooking or metal detectionA reading or test-piece run, the response to a rejectRecords across shifts, deviations, calibrationValues outside the limit with no product hold
OPRP, such as chilling or sievingMonitoring as performedRecords, actions at the action criterionNight-shift operators unaware of the criterion
Traceability and recallLot coding, rework handlingA forward and a backward trace, the last mock recallQuantities that do not reconcile
Pest control and buildingDoors, seals, drains, bait stationsContractor reports, maintenance requestsContractor recommendations open for months

Reporting, follow-up and the certification audit

Write each finding so that someone who was not there understands it: the requirement, the evidence and the gap. Grade consistently, send the report to the food safety team and area managers, and agree an owner and a date for each finding. A correction fixes the instance; a corrective action removes the cause. Verify closure on the floor or in the records, and feed results into management review and, where a control is involved, into the review of the hazard analysis.

The certification body's audit is performed by an independent, accredited body to decide on certification; it samples the whole system over a few days and cannot advise. Your internal audit runs all year, goes deeper, can recommend improvements and is one of the first records the certification auditor reads. What happens then is covered in ISO 22000 Stage 1 and Stage 2 audits: what auditors check on the floor.

How Sterling supports internal audit

An audit programme that tests the plant, not just the paperwork.

Sterling's expert and experienced consultants set up your risk-based programme, train your internal auditors and complete the first full audit cycle on the floor with your team before the certification body arrives, at the support level you choose: Design™, where your auditors lead with our structure and coaching, or Drive™, where Sterling takes on the agreed audit work. Findings and corrective actions sit in Effivity, included with the engagement, at no additional cost. We ensure successful certification for our clients. Sterling does not certify; the accredited certification body audits and decides.

Book a free discovery call

ISO 22000 internal audit: questions buyers ask

Can our food safety team leader carry out internal audits?

For areas they do not run or supervise, yes, once trained as an auditor. Another trained or external auditor covers the hazard analysis and plan they built.

Is the internal audit the same as verification of the hazard control plan?

No. Verification is a routine operational check such as record review or product testing. The internal audit examines whether verification, monitoring and the rest of the system are carried out and effective.

Do we need to audit the night shift?

If it produces food within the scope, yes. Controls often weaken when supervision is thinner.

Should floor observations be announced?

Share the audit plan with the area, but keep the exact timing of observations flexible. Normal work gives a truer picture than a prepared line.

Can one internal audit cover ISO 22000 and ISO 9001 together?

Yes, with auditors competent in both and a checklist that keeps food safety controls visible. See integrating ISO 22000 with ISO 9001 and ISO 14001.

How many internal auditors does a plant need?

Enough to cover every area without anyone auditing their own work, typically a small group from different departments, with an external auditor for what remains.

ISO 22000 implementation

ISO 22000 requirements

Talk to a consultant

Build an internal audit programme that tests your plant, not just its paperwork.

Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.

hello@sterling-grc.com

+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page

What would you like to achieve?

Choose a starting point. The enquiry form takes about a minute.

Your goal
Book my free discovery call

Continue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice