Two-minute brief
API Spec Q1 requirements explained: video brief
A two-minute brief on the American Petroleum Institute's quality management standard for organisations providing products to the petroleum and natural gas industry.
Key takeaways
- API Spec Q1 uses three sections rather than clauses 4 to 10.
- Contingency planning is required in its own right.
- Management of change includes informing affected people and customers.
- APIQR registers conforming organisations after an on-site audit.
- The API Monogram licence requires a Q1-conforming system.
Three sections, not clauses 4 to 10
API Specification Q1 is the American Petroleum Institute's quality management system standard for the upstream supply chain. Its 10th Edition covers manufacturers of wellhead, valve, tubular, drilling and production equipment and the facilities that machine, weld, heat-treat, coat, distribute or repair those products. API describes Q1 as meeting most of the requirements of ISO 9001, with further requirements written for the risks of oil and gas. This short film walks through its structure.
Q1 does not follow the harmonised clause 4 to 10 structure. Its requirements sit in three sections: section 4 on the quality management system itself, section 5 on product realisation and section 6 on monitoring, measurement, analysis and improvement, with a normative Annex A on the use of the API Monogram by licensees. Section 4 covers the quality policy, measurable objectives, planning, communication, management responsibility and organisational capability.
What Q1 adds for oil and gas
Q1 adds the discipline an operator wants to see before a component goes downhole or under pressure: risk assessment, contingency planning for the events that would stop delivery, management of change with the people and customers affected informed, and controlled contract review, design, purchasing, manufacturing, inspection and release. Contingency planning, one of the requirements that most distinguishes Q1 from ISO 9001, is required in its own right.
The 10th Edition was published in September 2023 and has been effective since September 2024, with API's errata and addenda; the 9th Edition transition has ended. Registration is issued by APIQR, API's own registrar, after a full-system on-site audit; API calls the outcome registration rather than certification. The API Monogram is a separate product-marking licence that requires a Q1-conforming system.
API describes Q1 as meeting most of the requirements of ISO 9001 and adding requirements specific to the petroleum and natural gas industry, such as risk assessment, contingency planning, management of change, tiered supplier evaluation, quality plans and validated special processes. Before API accepts an application, the system must have run for at least four months, with a documented internal audit of all its elements and a documented management review; registered organisations then face surveillance audits at least once every calendar year.
API Spec Q1 at a glance
- Purpose
- Quality management for organisations providing products to the petroleum and natural gas industry: controlled contract review, design, purchasing, manufacturing, inspection and release, with risk, contingency and change managed
- Relevant to
- Manufacturers, machine shops, welders, heat treaters, coaters, distributors and repairers of wellhead, valve, tubular, drilling and production equipment, and any facility seeking the API Monogram
- Edition
- 10th Edition, published September 2023 and effective from September 2024, with API's errata and addenda; the 9th Edition transition has ended
- Certification
- Registration by APIQR, the American Petroleum Institute's own registrar, after a full-system on-site audit; the API Monogram is a separate product-marking licence that requires a Q1-conforming system
- Sterling's role
- Consulting with your team, Effivity, training, the internal audit and management review API requires, audit readiness, then Sustain™
- Cost and timing
- Total investment for an API Spec Q1 QMS depends on the current maturity of your processes, the scope, locations and number of employees. The process typically takes 6 to 10 months
API Spec Q1: questions people ask
Is API Spec Q1 the same as ISO 9001?
No. API describes Q1 as meeting most of the requirements of ISO 9001 and adding requirements specific to the petroleum and natural gas industry: risk assessment, contingency planning, management of change, tiered supplier evaluation, quality plans, validated special processes and longer record retention. ISO 9001 is a good foundation, but it does not satisfy a customer who asks for Q1, and it does not give you the Monogram.
Do we need Q1 registration, the API Monogram, or both?
It depends on what your customers ask for. APIQR registration certifies your quality management system against Q1. The Monogram licence authorises your facility to mark newly manufactured products that conform to a specific API product specification, and requires a Q1-conforming system. A facility can hold either or both; joint applications carry an additional registration fee.
Can any certification body certify us to API Spec Q1?
API Spec Q1 registration is issued by APIQR, API's own registrar, and the Monogram licence by API's Monogram Program; both appear on the API Composite List. Another body may audit you against Q1 and issue its own conformity certificate, but that is not an API registration, will not appear on the Composite List and never authorises the Monogram. Ask your customer which they require before choosing a route.
How long must the system run before we can apply?
API requires a system operational for at least four months, a documented internal audit of all its elements and a documented management review before it accepts an application. For the Monogram, the facility must also have the technical capability to manufacture the product and, unless the exclusion applies, a design package for each product in scope.
Is there a Stage 1 audit, as with ISO certification?
API's published programme requirements describe a single full-system on-site audit covering all processes, scheduled after the application is accepted, rather than the two-stage audit of an ISO/IEC 17021-1 certification. Nonconformities are answered with correction, root cause analysis and corrective action before API completes its review and decides.
Keep exploring
Related to this video
The complete guide
Everything on API Spec Q1
Start with the API Spec Q1 page, or go straight to the guide you need.
On the API Spec Q1 page
- What are the main API Spec Q1 requirements?
- How do you get API Spec Q1 certified?
- How much does API Spec Q1 certification cost?
- How long does API Spec Q1 certification take?
- Who needs API Spec Q1 certification?
- How API Spec Q1 supports conforming product and operator confidence
- Frequently asked questions about API Spec Q1
Often combined with API Spec Q1
More videos: Construction, energy, oil and gas
Talk to a consultant
Plan your API Spec Q1 certification with confidence.
Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.
hello@sterling-grc.com+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page
What would you like to achieve?
Choose a starting point. The enquiry form takes about a minute.
Book my free discovery callContinue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice