hello@sterling-grc.com +1 201 263 4443 New York ISO & GRC consulting in 60+ countries
SterlingInternational Consulting Talk to a consultantTalk to us
← ISO 45001 hub

ISO 45001 guide

ISO 45001 Stage 1 and Stage 2 audit: what auditors check on site, day by day

Clause by clause: ISO 45001:2018 requirements: every clause explained →

What the certification body checks at the ISO 45001 Stage 1 readiness review and the Stage 2 audit: the documents and site conditions it reviews, the workplace tour, how sites, shifts and contractors are sampled, how findings are graded and who decides.

  • Updated September 2026
  • 8-minute read
  • Part of the ISO 45001 hub

Key points

  • An initial ISO 45001 certification audit runs in two stages: Stage 1, the certification body's readiness review, and Stage 2, which tests on site whether the OH&S management system is implemented and effective.
  • For OH&S, the accreditation rules expect the auditor to see the system during operational activities, which means a tour of the workplaces and conversations with the people doing the work.
  • Audit time and site coverage follow your effective headcount, including contractors under your control, and the OH&S risk category of your activities.
  • The auditor grades findings and recommends; competent people at the certification body who were not on the audit take the certification decision.

What Stage 1 and Stage 2 check in an ISO 45001 audit

Stage 1 asks whether your occupational health and safety management system is ready to be audited in full. Stage 2 asks whether the system control the hazards your workers actually face, across every site, shift and activity in the scope.

The two-stage pattern comes from ISO/IEC 17021-1, the requirements standard that accreditation bodies use to assess certification bodies. IAF MD 22, the mandatory document for OH&S certification, adds rules specific to health and safety, including the expectation that implementation is evaluated while work is under way.

Picking the body is covered in choosing an ISO 45001 certification body, and the full route from decision to certificate in the certification process guide.

Stage 1: the readiness review for an OH&S system

ISO/IEC 17021-1 fixes the objectives of Stage 1; in OH&S terms they become this list.

Stage 1 objectiveWhat it means for ISO 45001What the auditor expects to see
Review your documented informationScope, OH&S policy, objectives, hazard identification and risk assessment methodApproved, current versions with owners; a recorded decision on whether climate change is relevant (4.1)
Evaluate site conditions and preparednessWorkplaces, high-risk activities, shifts, temporary or client sitesSafe access for the auditor, supervisors available, permits and emergency arrangements visible
Check your understanding of the requirementsHow hazards are found, risks rated and controls chosen in hierarchy order (6.1.2, 8.1.2)A hazard register covering routine and non-routine work; objectives with measures and owners
Confirm scope and legal requirementsSites, activities, workers and contractors in scope; OH&S law by jurisdiction (6.1.3)A legal register with owners and a completed evaluation of compliance (9.1.2)
Agree Stage 2 resources and detailsWhich sites, shifts and tasks the auditor must witnessRosters, a list of high-risk tasks and dates when they run
Evaluate internal audit and management reviewWhether the system has already checked and reviewed itselfCompleted audit reports across sites and shifts; minutes of a management review with decisions

Expect part of Stage 1 at your premises: the certification body must tell you in advance which activities will be on site, and the condition of a workshop or a yard cannot be judged from a document list.

Stage 1 closes with documented conclusions on readiness and a list of concerns that could become nonconformities at Stage 2. It is not a gap analysis, which is the first stage of Sterling's engagement: the auditor names the concern and leaves the remedy to you.

The interval before Stage 2

The certification body sets the gap between the stages with your need to resolve those concerns in mind, and it may change its Stage 2 arrangements because of what it found. You receive the audit plan and the audit team's names in advance; a justified objection to a team member requires the body to change the team.

Stage 2: the system at the point of work

Stage 2 evaluates implementation, including effectiveness, at your sites. Under ISO/IEC 17021-1 it must cover at least conformity with all ISO 45001 requirements in scope, performance monitoring against your objectives, legal and contractual compliance, operational control, internal audit and management review, and management responsibility for the policy.

What makes an OH&S Stage 2 different is where the evidence lives. IAF MD 22 expects evaluation during operational activities, with a tour of facilities and work sites given as the example. In practice the auditor will:

  • Watch a task and compare it with its risk assessment, method statement and permit, and ask the operator what the hazards are.
  • Test the hierarchy of controls: was elimination or substitution considered before personal protective equipment became the answer?
  • Follow an incident from report to investigation, to the revised risk assessment, to whether the control changed on the floor (10.2).
  • Check contractors against prequalification, induction and supervision records (8.1.4).
  • Ask non-managerial workers how they raise a concern and whether they know they may remove themselves from imminent and serious danger.

Effectiveness is judged by consequence. A drill record shows the drill happened; a drill report whose lessons altered the emergency plan (8.2) shows the system learns.

A typical ISO 45001 Stage 2, day by day

The certification body sets audit time under IAF MD 5 from effective personnel, contractors included, and the OH&S risk category of your activities; the cost guide explains those drivers. The table illustrates three days at one manufacturing site and one auditor.

WhenActivityWho takes partWhat is sampled
Day 1, first hourOpening meeting and site safety induction for the auditorTop management, OH&S coordinator, guidesPlan, changes since Stage 1, site rules
Day 1, morningLeadership: context, policy, roles, objectives, management reviewSenior manager, OH&S coordinatorObjectives and results, review decisions, Stage 1 concerns closed
Day 1, afternoonWorkplace tour and hazard identificationSupervisors, safety representativesTasks seen against the hazard register and risk assessments
Day 2, morningHigh-risk activities: permits, lock-out, work at height, chemicalsOperators, maintenance, permit issuersLive permits, isolation records, equipment inspections
Day 3, morningLegal compliance, contractors, incidents, competence, consultationHR, purchasing, committee members, internal auditorsCompliance evaluation, contractor files, investigations, committee minutes
Day 3, afternoonAuditor prepares conclusions; closing meetingManagement and process ownersFindings, grading and deadlines

How auditors sample sites, shifts and contractors

ISO/IEC 17021-1 requires evidence to be gathered by appropriate sampling and verified through interviews, observation and review of documents and records. For OH&S, the rules narrow what can be sampled:

  • Different risks, no sampling: IAF MD 22 states that sampling is not appropriate where several sites do not share the same activities, processes and OH&S risks. A depot and a fabrication shop are not interchangeable.
  • Temporary sites such as project locations are selected for visits on an evaluation of risk.
  • Remote methods may replace only the parts of an on-site audit that do not involve witnessing process control and other OH&S risk control.

A clean Stage 2 does not prove every task is safe, and one finding does not condemn a whole site. The questions auditors typically ask on the floor are gathered in our audit questions guide.

Findings, the closing meeting and the certification decision

Every nonconformity is recorded against a specific ISO 45001 requirement, with a plain statement of what is wrong and the objective evidence. It is discussed with you; that is the moment to produce a record the auditor missed. The auditor may not suggest the cause or the fix, which protects the impartiality of the certificate.

  • Major nonconformity: affects the capability of the system to achieve its intended results, for example no evaluation of compliance with OH&S law at all.
  • Minor nonconformity: does not affect that capability, for example one overdue inspection in an otherwise working programme.
  • Opportunity for improvement: recorded where the scheme permits; it is not a nonconformity.

At the closing meeting you are told the conclusions and the recommendation, that the evidence came from a sample, how findings are graded, the deadline for corrections and corrective action plans, what the certification body does next, and how complaints and appeals work.

Competent people at the certification body who did not take part in the audit then decide, once corrections and corrective actions for every major nonconformity have been reviewed, accepted and verified, and plans for minor ones accepted. If a major is not verified within six months of the last day of Stage 2, another Stage 2 is needed. Closing findings is covered in our nonconformities guide, and the three-year cycle that follows in our surveillance and recertification guide.

How Sterling prepares you for both stages

A Stage 1 with no surprises, and a Stage 2 your supervisors can explain.

Sterling's consultants run the internal audit across sites and shifts, support the management review, walk your workplaces with the Stage 2 plan in mind and close every finding with evidence before the certification body arrives. Records sit in Effivity, included with the engagement at no additional cost, so any sample can be produced quickly. We ensure successful certification for our clients. The audit and the decision belong to the independent, accredited certification body; Sterling does not certify.

Book a free discovery call

ISO 45001 Stage 1 and Stage 2 audits: questions buyers ask

Does the ISO 45001 auditor need to see high-risk work being done?

Yes, as far as the plan allows. The OH&S accreditation rules expect evaluation during operational activities, so schedule Stage 2 on days when permits, maintenance and other high-risk tasks are actually running.

Will the auditor interview ordinary workers, not just managers?

Almost certainly. Consultation and participation of non-managerial workers is a requirement of ISO 45001, and the quickest way to test it is to ask operators and contractors how they report a hazard and what happened next.

Can an ISO 45001 Stage 2 be done remotely?

Only in part. Remote methods may replace the parts of an on-site audit that do not involve witnessing process control and OH&S risk control, so the workplace tour and task observation stay on site.

Are contractors on site included in the audit?

Yes. Contractor personnel under your control count towards effective headcount for audit time, and the auditor checks how they are selected, inducted and supervised.

What if we have a serious incident between Stage 1 and Stage 2?

Tell the certification body. Expect the auditor to follow the investigation, the revised risk assessment and the change to controls; after certification, a serious incident or breach of regulation can also prompt a special audit.

ISO 45001 implementation

ISO 45001 requirements

Get the document

We e-mail the document as a PDF link. Tell us who you are and where to send it.

A quick security check confirms the request comes from a person.

By requesting the document you agree to our privacy notice. Sterling uses these details to send it and to respond to your request. We never sell your data.

Talk to a consultant

Go into your ISO 45001 Stage 1 and Stage 2 audits ready.

Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.

hello@sterling-grc.com

+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page

What would you like to achieve?

Choose a starting point. The enquiry form takes about a minute.

Your goal
Book my free discovery call

Continue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice