hello@sterling-grc.com +1 201 263 4443 New York ISO & GRC consulting in 60+ countries
SterlingInternational Consulting Talk to a consultantTalk to us
← ISO 9001 hub

ISO 9001 guide

ISO 9001 nonconformities: major, minor, and how to close them before they cost you the certificate

Clause by clause: ISO 9001 Clause 10.2: Correct Problems and Test the Result →

What makes an ISO 9001 nonconformity major or minor, how an auditor writes one, the difference between correction and corrective action, the evidence that closes a finding, eight typical findings with their fixes, and what happens if a major stays open.

  • Updated September 2026
  • 8-minute read
  • Part of the ISO 9001 hub

Key points

  • Certification bodies grade findings under ISO/IEC 17021-1. A major nonconformity affects the capability of your quality management system to achieve its intended results; a minor one does not.
  • Every nonconformity needs a correction, a cause analysis and a corrective action: the sequence set out in ISO 9001 clause 10.2, Nonconformity and corrective action.
  • The certification body sets the response deadline. Majors must be verified as closed before a certificate is granted; for minors, an accepted plan is normally enough.
  • An open major blocks the certificate, forces another Stage 2 if it is not verified within six months, and can suspend an existing certificate or stop its renewal.

How certification bodies grade a nonconformity

A nonconformity is the non-fulfilment of a requirement, whether it sits in ISO 9001 or in your own system, such as a procedure you wrote. ISO/IEC 17021-1, the standard to which certification bodies are accredited, defines two grades. A major nonconformity "affects the capability of the management system to achieve the intended results"; a minor one does not.

The standard names two situations in which a finding can be graded major: significant doubt that a process is under effective control, or that products or services will meet specified requirements; and a number of minors against the same requirement or issue that together demonstrate a systemic failure. An opportunity for improvement is not a nonconformity at all. The auditor may record one where the certification scheme allows it, and no formal response is required.

How a nonconformity is written: requirement, evidence, statement

Certification rules require each nonconformity to be recorded against a specific requirement, with a clear statement and the objective evidence behind it, identified in detail. A sound finding has all three parts:

  • Requirement: ISO 9001 clause 7.2, Competence: people whose work affects the performance of the quality management system must be competent, with evidence to show it.
  • Evidence: three of the five final inspectors sampled had no record of training or assessment for the dimensional check they sign off.
  • Statement: the organisation could not demonstrate the competence of all personnel performing final inspection.

The auditor has to discuss each finding with you so that the evidence is accurate and understood: that is the moment to produce any record the auditor missed. The auditor must not suggest the cause or the fix, which would mean auditing their own advice later.

Correction, root cause and corrective action

Clause 10.2 of ISO 9001, Nonconformity and corrective action, sets the sequence for every nonconformity, whether an auditor, a customer or your own inspection found it. Weak responses blur its three parts. Taking the competence finding above:

Correction: deal with the instance

Assess the three inspectors and record the result; until then, someone competent signs off final inspection. Then deal with the consequences by checking whether anything they released needs rechecking.

Root cause: find out why

Keep asking why until the answer is a process, not a person. Here, onboarding covered safety and HR induction but had no step for role-specific competence. Clause 10.2 also asks whether the same problem exists, or could occur, elsewhere, so check every role that releases work.

Corrective action: remove the cause

Add a competence step to onboarding for those roles and a skills matrix reviewed each quarter. Be wary of "operator retrained" as a corrective action: unless the training process itself failed, retraining one person will not stop the next one making the same mistake. Then review whether the action worked, and keep the record of the nonconformity, the action and its result.

The deadline and the evidence that closes a finding

The certification body sets the deadline, commonly within a fixed number of days, and gives it at the closing meeting as the timeframe for presenting your plan for correction and corrective action; sector schemes such as IATF 16949 fix their own limits. It then reviews your causes and actions and verifies that they worked, by a further visit or by documented evidence.

Closure evidence shows change that has happened, not change that is promised:

  • new records dated after the audit, such as the competence assessments;
  • the changed control with its new revision and approval, such as the onboarding checklist;
  • the first records completed under that control, not a blank form;
  • for effectiveness, enough data over time to show the problem has not returned.

Eight real-world ISO 9001 nonconformities and their fixes

The findings below are composites from audits across sectors, not extracts from any one report. Grades assume an isolated finding and rise where product has reached customers or the pattern repeats.

FindingRequirement and typical gradeCorrectionCorrective action
Two of six sampled orders were accepted with changed delivery terms that nobody reviewedClause 8, requirement review
Minor
Review both orders; confirm terms with the customersAmendments routed through the order system, not e-mail
Two torque wrenches at final assembly were four months past calibrationClause 7, measuring equipment
Minor; major if product conformity is in doubt
Recalibrate; assess product checked since the last valid calibrationCalibration schedule with reminders and a named deputy
Operators were using revision C of a work instruction; revision E was approvedClause 7, documented information
Minor
Withdraw old copies; brief operators on revision EIssue only from the controlled system; recall copies at every change
A plating subcontractor had no evaluation on file despite three rejected batchesClause 8, external providers
Minor; major if outsourced work is uncontrolled
Evaluate the supplier; tighten incoming inspection meanwhileRe-evaluation triggered by rejections; annual review against set criteria
Rejected parts sat unlabelled beside dispatch; one batch shipped before dispositionClause 8, nonconforming outputs
Typically major: nonconforming product reached a customer
Segregate, label and inform the affected customerMarked quarantine area, named disposition authority, release check at dispatch
The internal audit programme had not covered production or purchasingClause 9.2, internal audit
Minor or major, by how much scope was missed
Audit both processes before the response dateProgramme covering the whole scope, weighted by process importance and past results
Management review minutes listed attendees and slides but no decisionsClause 9.3, management review
Minor
Reconvene; record decisions on resources, changes and improvementStanding agenda; outputs logged as actions with owners and dates
A late-delivery action was closed as "planner retrained"; late deliveries have since risenClause 10.2, nonconformity and corrective action
Minor; major if systemic
Reopen the action; contain current late ordersCause found in delivery data; closed only after an effectiveness check

What happens when a major nonconformity is not closed

At initial certification

No certificate can be granted while a major is open. If the certification body cannot verify its correction and corrective action within six months after the last day of Stage 2, it must conduct another Stage 2 before recommending certification.

While the certificate is valid

Certification bodies suspend certification when, for example, a certified organisation fails to meet certification requirements; a major left open past its deadline is one way to get there. A suspended certification is temporarily invalid, so it cannot support a tender or a customer's supplier approval. If the issue is not resolved, certification is withdrawn or its scope reduced.

At recertification

Corrections and corrective actions for any major raised at recertification must be implemented and verified before the certificate expires; if not, it is not renewed. Certification can be restored within six months of expiry once the outstanding recertification work is complete; after that, at least a Stage 2 is needed. The surveillance and recertification guide covers the whole three-year cycle.

Keeping findings few, and minor

Many Stage 2 majors can be seen coming: a process the internal audit never reached, a record nobody kept, or small lapses in three departments that add up to one systemic failure. Let your internal audit find them first, treat a pattern as one problem, and close actions with evidence rather than dates. The common mistakes guide covers the ten that fail audits.

How Sterling handles audit findings

Findings closed with evidence, inside the deadline.

Sterling's consultants conduct your internal audit before Stage 2, so findings surface while there is time to act. When the certification body raises one, we work through the cause with the process owner, help you write a response the reviewer can follow, and keep the evidence in Effivity, included with the engagement at no additional cost. We ensure successful certification for our clients. The grading and the decision stay with the independent, accredited certification body; Sterling does not certify.

Book a free discovery call

ISO 9001 nonconformities: questions buyers ask

How many minor nonconformities can we have and still be certified?

ISO/IEC 17021-1 sets no maximum. Before the decision, the certification body must have accepted your plan for every minor and verified every major. Numbers still matter: several minors against the same requirement or issue can be graded together as a major.

Does closing a major always need a second visit?

No. The certification body chooses between an additional full audit, an additional limited audit and documented evidence, depending on the finding; a missing process is more likely to need a visit than a missing record. Either way, verification comes before the certification decision.

Can we disagree with a nonconformity?

Yes, on the facts, and during the audit, with the record that shows the requirement was met. Accredited certification bodies also have a formal appeals process. Arguing with a finding the evidence supports only uses up time you need for the fix.

Do nonconformities from our internal audit count against us?

No. The certification body expects internal audits to find nonconformities and checks whether they went through clause 10.2, with causes analysed and effectiveness reviewed. Properly closed internal findings are strong evidence that the system works.

Do we have to act on opportunities for improvement?

No formal response is required, and they do not affect the certification decision. Record what you decided and why, even if the answer was no; the next auditor may ask.

ISO 9001 implementation

ISO 9001 requirements

Get the document

We e-mail the document as a PDF link. Tell us who you are and where to send it.

A quick security check confirms the request comes from a person.

By requesting the document you agree to our privacy notice. Sterling uses these details to send it and to respond to your request. We never sell your data.

Talk to a consultant

Plan your ISO 9001 certification with confidence.

Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.

hello@sterling-grc.com

+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page

What would you like to achieve?

Choose a starting point. The enquiry form takes about a minute.

Your goal
Book my free discovery call

Continue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice