Control A.7.13ISO/IEC 27001:2022 · Physical controls

ISO 27001 A.7.13: Maintain equipment without losing control

Equipment maintenance should preserve the information and services the equipment supports, not merely restore a device that powers on. ISO 27001 Annex A.7.13 connects correct maintenance with availability, integrity and confidentiality. Planned servicing, emergency repair and supplier access can each introduce exposure if the organisation loses track of who is working, what may change and how the equipment returns to service.

Part ofA.7 · Physical controls|Reading time 6 min

What A.7.13 requires in practice

Annex A control 7.13 asks that equipment is maintained correctly, so that information stays available, accurate and confidential. The control looks at the equipment that supports information processing, including the protective and supporting systems around it. Parts to consider are what needs maintenance and how often, who is responsible, how work is authorised, what access the maintainer receives and how the equipment is protected while it waits for repair. Planned servicing, emergency repair and supplier access can each create exposure if nobody tracks who is working, what may change and how equipment is returned to service. The outputs are a maintenance approach based on the equipment's role and the supplier's recommendations, an owner able to act on overdue work, and records showing authorised and completed work. The standard does not prescribe a maintenance interval or a particular service model.

Define the equipment and its maintenance needs

Identify equipment supporting information processing, including relevant protective and utility systems. A programme focused only on servers can miss the power, cooling or physical monitoring equipment on which those servers depend. Determine appropriate service arrangements using competent advice and the equipment's role and condition.

Assign an owner who can act on overdue work and recurring faults. A maintenance calendar should lead to a decision when a task is deferred, not quietly convert an overdue item into an accepted condition. Consider how the equipment will remain protected while waiting for parts or specialist support, and who can approve any temporary arrangement.

ISO/IEC 27001 consulting & certification support

Get clause A.7.13 right the first time — with a global leader in ISO/IEC 27001 implementation

A Sterling consultant works the requirement through with your team, links it to the rest of the system and carries it to certification readiness. Expert and experienced consultants, 8,100+ client engagements in 60+ countries.

Authorise the work and the access it needs

Before maintenance, define the task, responsible provider and permitted access. A supplier may need physical access, remote access or information about the system. Limit that access to the work and clarify how it will end. Appropriate confidentiality and supplier arrangements support the decision, but do not replace supervision or technical control where these are necessary.

Remote maintenance needs an authorised route with suitable authentication, monitoring and termination arrangements. Do not leave a temporary support method available indefinitely because the repair succeeded. Changes introduced during maintenance should reach the people responsible for configuration, service operation and security.

Why controlled equipment maintenance matters to the business

Equipment that is not maintained fails at the worst time, and equipment that is maintained carelessly can leak. A technician with unrestricted access may see information, remove a storage component or leave the device in an unknown state. Planned maintenance keeps services available and extends equipment life, and disciplined control of the work protects confidentiality and integrity. Customers depend on your equipment staying reliable, and often on your suppliers behaving properly. At audit, maintenance is tested through records and sampling, so evidence that work was authorised, completed and followed up shows that equipment support is under control rather than left to goodwill.

How to implement A.7.13

Treat maintenance as both a reliability task and an access decision. Keep the scheme proportionate so that low-risk equipment does not absorb as much effort as critical items. Include equipment held at remote or unmanned sites, which is often serviced less carefully.

  1. List the equipment supporting information processing, including power, cooling and monitoring systems, and note its condition.
  2. Define maintenance needs from supplier information, competent advice and the role the equipment plays.
  3. Assign an owner who can act when work is overdue or faults recur, and require a decision when tasks are deferred.
  4. Authorise each job in advance, stating the task, the provider and the access and information they may use.
  5. Agree confidentiality terms with suppliers and decide how remote access is granted and ended.
  6. Plan how equipment is protected while awaiting parts, and who approves temporary arrangements.
  7. Check equipment after servicing and before return to service, and keep records of work done.

Illustrative BPO example: a printer sent for repair

Illustrative example 1

A fictional BPO centre prepares to send a multifunction printer to a repair company. The equipment has processed client documents and may contain stored information. The facilities team sees a broken office device, while the information owner sees a potential transfer of sensitive content.

Illustrative example 2

The organisation establishes what storage is present and obtains appropriate technical advice before release. It selects a repair arrangement that protects the information, records custody and agrees the provider's permitted activity. On return, it checks the equipment and relevant settings before normal use. Evidence follows the device through the entire repair, rather than relying only on a courier receipt and service invoice.

Automate™ on Effivity · included in every Sterling engagement

Keep clause A.7.13 alive in Effivity

Record what you decided under clause A.7.13, link it to the records and controls it affects, and let the review date trigger the next look. Effivity is the ISO & GRC software used in 50+ countries — and part of every Sterling ISO/IEC 27001 programme.

Illustrative manufacturing example: an emergency remote service session

A hypothetical manufacturer asks a support provider to diagnose a production-support computer outside ordinary working hours. The provider requests remote access, and the plant is under pressure to restore operations quickly. A familiar engineer's request is treated initially as sufficient authorisation.

The responsible owner confirms the task and approves the established support route. Relevant access is controlled for the session, necessary changes are recorded and the provider's temporary permission is removed afterward. The team verifies the affected function and checks that the authorised configuration remains appropriate. The example illustrates a controlled emergency route, not a reason to postpone protection until business pressure has passed.

Verify the return to operation

Completion needs more than confirmation that a technician attended. Determine appropriate checks for function, condition and possible unauthorised changes before equipment returns to normal service. The depth of verification depends on what was done and what the equipment supports. A routine physical repair and a replacement of a critical component may need different evidence.

If equipment cannot be repaired or is replaced, move it into the appropriate disposal or reuse process. A rejected component can retain information even when it no longer functions normally. Avoid allowing a service provider to dispose of it under an undefined default arrangement.

Evidence that supports continuing confidence

What counts as evidence

Useful evidence includes planned maintenance, known faults, authorised work, provider activity and return-to-service checks. These are practical records rather than one mandated ISO maintenance form. The ISMS needs appropriate information to demonstrate the selected control and its operation, while sensitive technical detail and credentials require protection.

Review patterns as well as individual completions. Repeated failures, expired support or frequent emergency access may indicate a wider lifecycle problem. Ask whether the maintenance programme still fits equipment age, operating conditions and service needs. A high percentage of completed tasks can conceal a critical unresolved defect if every item is treated as equally important.

Coordinate maintenance with off-site asset protection and change management. Under operational planning, ensure the repair, access and service owners share the information needed to make a complete decision.

Common nonconformities with A.7.13

Findings usually concern maintenance that is either missing or uncontrolled. The theme is that maintenance was arranged but not governed, which shows up quickly when an auditor asks to follow one job from request to completion.

  • Overdue servicing quietly accepted with no recorded decision.
  • Supplier technicians given broad physical or remote access with no defined task.
  • Maintenance programme covering servers but not supporting power or cooling equipment.
  • No check that equipment returned to service in a secure and correct state.
  • Storage components removed during repair with no record of where they went.

Frequently asked questions

Does ISO 27001 prescribe one maintenance interval?

No. Establish a suitable programme using equipment needs, relevant supplier recommendations, actual conditions and applicable obligations. Review deferred work and changes in those assumptions.

Can a trusted supplier have permanent support access?

Trust alone is insufficient. Define the justified need and appropriate controls, including review and removal. Temporary work should not silently create lasting access.

Is a successful repair enough to close the task?

Confirm the relevant function and security conditions before closure. Also address temporary permissions, replaced components, recorded changes and any unresolved limitations.

Bring maintenance into the security lifecycle

Discuss maintenance governance and ISMS support with Sterling, including documentation, employee learning and agreed Effivity ISO & GRC automation software. Scoped authorised vulnerability scanning and findings review can support the wider programme. Sterling continues through agreed consulting and documentation work and preparation; the certification decision belongs to an independent body. Enrol in ISO/IEC 27002 Information Security Controls to examine how maintenance interacts with other safeguards. See the physical controls overview for the full lifecycle.

Source basis and reading note. This is original practical guidance for ISO/IEC 27001:2022. Use an authorised copy for definitive requirements. Illustrative examples describe hypothetical situations, not client results. Implementation methods are distinguished from requirements; independent bodies decide certification outcomes. Issuer standard record Issuer standard record: iso.org.
Disclaimer. This guide is provided for general information only. It is not the text of the standard, not legal or professional advice, and not a representation of how any certification body will assess your organisation. Sterling International Consulting accepts no liability for any loss arising from reliance on it. Requirements are applied to each organisation's own context through an engagement; contact us to implement ISO/IEC 27001 in your organisation.