ISO 22000 guide
ISO 22000 gap analysis: what it covers on the floor and in the files, and what you get
Clause by clause: ISO 22000:2018 requirements: every clause explained →
What Sterling's ISO 22000 gap analysis examines on the production line and in your records, how it differs from the readiness check and Stage 1, who takes part, how long it takes and what you receive.
Key points
- An ISO 22000 gap analysis is Sterling's first engagement stage: a structured comparison of how your plant controls food safety today with what the standard requires, carried out on the production floor as much as in the office.
- It examines four things together: documents, practice on the line, the records that prove practice, and the people who own each control.
- You receive a gap report organised by requirement area, a prioritised action plan that separates infrastructure works from paperwork, and an effort estimate that turns into your project plan.
- It is neither the free online readiness check nor the certification body's Stage 1 readiness review. Sterling does not certify; an independent, accredited certification body audits and decides.
What an ISO 22000 gap analysis is, and why a food plant needs one first
A gap analysis answers one practical question before any money goes into implementation: how far is this site from a food safety management system that an accredited certification body would certify? Sterling's consultants review your existing controls against ISO 22000:2018 with its 2024 amendment, walk the process from goods receipt to dispatch, sample the records and talk to the people who run each step. The result is a clear picture of what already meets the standard, what exists but does not work, and what is missing altogether.
Food plants need this step more than most. Many already hold a HACCP certificate, a customer approval or a local food licence, so a great deal of the system exists. The question is whether it holds together: whether the hazard analysis still matches the lines you actually run, whether the prerequisite programmes are working in practice rather than on paper, and whether the records would survive an auditor tracing a lot back to its raw materials.
What Sterling's gap analysis examines
The review covers the whole standard, from context and leadership to improvement, but the weight falls where food safety is won or lost: the operation. The requirements guide explains the clauses themselves.
Prerequisite programmes, on the line
A floor walk comes before the document review, not after it. We look at personal hygiene and changing facilities, cleaning and sanitation, pest control, maintenance and the condition of equipment, allergen segregation and changeover, water supply, waste handling, and the separation of raw and finished areas. We check them against the ISO 22002 part that fits your food chain category and against the legal requirements that apply to the site.
The existing HACCP plan and its hazard analysis
We read the flow diagrams and then verify them on site, because lines change and diagrams rarely follow. We examine whether each hazard was analysed for your product and process or copied from a generic model, whether control measures were categorised on a stated basis, and whether critical limits and action criteria were validated or simply assumed. This is often the largest single gap for plants moving from a standalone HACCP plan.
Records, traceability and supplier approval
We sample monitoring, verification, calibration, hold-and-release and corrective action records to see whether they were completed at the time or filled in afterwards. We test traceability by following one lot forward and back, and we review how suppliers of raw materials, packaging and services are approved and monitored.
People and competence
We establish who is on the food safety team, what training and experience they have, and whether line operators understand the controls they are responsible for.
| Area reviewed | How we look at it | Gaps commonly found |
|---|---|---|
| Context, leadership and planning | Interviews with the plant manager and QA; scope, policy and objectives | Scope not written down; objectives with no owner; climate change not considered as an issue |
| Prerequisite programmes | Floor walk across every shift area; PRP documents and verification records | Allergen changeover not verified; maintenance works outstanding; pest control trends never analysed |
| Hazard analysis and control plan | Flow diagrams verified on site; hazard analysis and validation evidence | Generic hazards; limits never validated; no clear distinction between OPRPs and CCPs |
| Traceability and recall | A live trace of one lot; the recall procedure and any mock recall report | Rework and packaging lots not linked; mock recall never timed |
| Monitoring, verification and calibration | Record sampling across shifts; calibration of thermometers, scales and detectors | Records completed from memory; verification results filed but not analysed |
| Evaluation and improvement | Internal audit programme, management review, corrective action log | Internal audits that skip PRPs; corrective actions closed without root cause |
How it differs from the readiness check and the Stage 1 readiness review
Three activities look at readiness, and they are easily confused. The readiness check is Sterling's free online self-assessment: a short questionnaire that gives you an indication of where you stand, based only on your own answers. The gap analysis is the professional review described on this page, done on site with evidence. The Stage 1 readiness review belongs to the certification body and takes place near the end of the project, to confirm that you are ready for the Stage 2 certification audit; the Stage 1 and Stage 2 guide explains what happens there.
A self-assessment cannot see a cracked floor behind a filler, and a Stage 1 finding arrives when the timetable has least room for it; the gap analysis catches both while they are cheapest to fix.
What you receive
A gap report organised by requirement area
Each finding states the requirement, what we observed, the evidence we saw or did not see, and the risk it poses to food safety and to certification.
A prioritised action plan
Actions are sorted by food safety risk and by lead time, and separated into two streams. Infrastructure works, such as repairs to floors and drains, hand-wash stations, segregation of allergen storage or changes to airflow, need budgets, contractors and approvals, so they must start first. Paperwork and practice actions, such as rewriting the hazard analysis, validating control measures, building the recall procedure or retraining operators, can run in parallel. Each action carries an owner and a target date agreed with your team.
An effort estimate
We estimate the internal time each workstream needs from your food safety team, production and maintenance, the validation or laboratory work likely to be required, and a realistic window for the certification audit. This becomes the basis of the implementation plan, which the implementation plan guide covers in detail.
Who needs to be in the room, and how long it takes
A gap analysis done only with the quality manager misses half the system. Plan for time with these people:
- Plant manager or site head: scope, resources, decisions on infrastructure works and the target date.
- Quality assurance: documents, records, supplier approval, complaints and laboratory results.
- Production supervisors: how the lines actually run on each shift, changeovers and deviations.
- Maintenance: equipment condition, calibration, preventive maintenance and hygienic design.
- HACCP or food safety team leader: the hazard analysis, validation evidence and verification activities.
The duration depends on the number of sites, process lines and product groups, the number of shifts, how complete the existing HACCP documentation is, and whether production is running during the visit. As an indicative estimate, a single plant with a small number of lines is usually covered in a few days on site, with the report issued shortly afterwards; multi-site or high-complexity operations take longer, and the proposal states the days before you commit.
What happens after the gap analysis
The report is presented to management in a closing session, where priorities, owners and the audit window are agreed. Implementation then starts with the level of support you choose: Design™, where your team implements with Sterling's structure, workshops and coaching, or Drive™, where Sterling's consultants take on the agreed consulting and documentation work alongside your process owners. The two are alternatives, not consecutive steps. The findings are loaded into Effivity, included with the engagement at no additional cost and used in 50+ countries, so every action is tracked from the first week and the records the certification body will test build up in one place.
How Sterling runs the gap analysis
A floor-first review that turns into your certification plan.
Sterling's expert and experienced consultants have carried out HACCP-based food safety work since 2003 and ISO 22000 work across 8,100+ client engagements in 60+ countries, with offices in 21 countries. The gap analysis is the first stage of every ISO 22000 engagement and sets the plan the rest of the project follows, through implementation, internal audit and management review to the certification body's assessment. We ensure successful certification for our clients. The certificate is issued by the independent, accredited certification body you choose; Sterling does not certify.
Book a free discovery callISO 22000 gap analysis: questions buyers ask
We already have a HACCP certificate. Do we still need a gap analysis?
Yes, although it is usually shorter. A HACCP plan covers much of the operational core, but ISO 22000 adds the management system around it, the prerequisite programmes at a defined level, traceability, emergency preparedness and the verification and review cycle. The gap analysis shows which parts of your existing work carry over unchanged.
Should production be running during the visit?
Ideally, yes. PRPs, changeovers, monitoring and record-keeping can only be judged while the lines are working.
Will the gap analysis tell us whether to aim for ISO 22000 or FSSC 22000?
It shows what either route would demand of your site, including the sector PRP part and any additional scheme requirements. The choice between them is covered in the comparison guide on HACCP, ISO 22000 and FSSC 22000.
Can the gap analysis be done remotely?
Parts of the document review can, but not the floor walk. Hygiene, segregation, equipment condition and the verification of flow diagrams need someone on the production floor, which is why Sterling plans on-site time for every food plant.
Do we have to fix every gap before the certification audit?
Every requirement in the scope must be met and shown to work, but not every improvement has the same deadline. The action plan separates what must be in place and producing records before the audit from improvements that can follow, so effort goes where the auditor and food safety need it first.
More ISO 22000 guides
Every guide in the ISO 22000 series is written for one question and links back to the hub for the whole picture.
- ISO 22000 certification cost: what moves the price
- ISO 22000 certification process, step by step
- Effivity for ISO 22000: the guide
- ISO 22000 for feed and animal food production
- ISO 22000 for food manufacturing
- ISO 22000 for packaging
- HACCP vs ISO 22000 vs FSSC 22000: which one, and when
- Hazard analysis, OPRPs and CCPs: the hazard control plan
- ISO 22000 implementation plan
- ISO 22000 internal audit: PRPs and the hazard control plan
- Prerequisite programmes and ISO 22002-1: what a plant needs
- ISO 22000 requirements explained, clause by clause
Keep exploring
Explore more about ISO 22000
Watch a video on how to implement ISO 22000 here.
Watch a video on ISO 22000 requirements here.
ISO 22000 resources
Services for ISO 22000
Talk to a consultant
Find out how far your plant is from ISO 22000, before you commit to a date.
Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.
hello@sterling-grc.com+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page
What would you like to achieve?
Choose a starting point. The enquiry form takes about a minute.