hello@sterling-grc.com +1 201 263 4443 New York ISO & GRC consulting in 60+ countries
SterlingInternational Consulting Talk to a consultantTalk to us
Clause 5.6ISO/IEC 17025:2017 · Define laboratory responsibility and scope

ISO/IEC 17025 clause 5.6: give staff authority to address deviations

Clause 5.6 requires personnel with the authority and resources needed to perform specified system responsibilities, even if they also hold other roles. Those responsibilities include maintaining and improving the management system, identifying deviations, initiating preventive or limiting action, reporting performance and helping ensure effective laboratory activities.

What clause 5.6 requires in practice

Clause 5.6 requires the laboratory to have personnel who, whatever else they do, hold the authority and resources to carry out five duties. They implement, maintain and improve the management system. They identify departures from the system or from the procedures for laboratory activities. They start actions to prevent or reduce those departures. They report to management on how the system is performing and where it needs to improve. And they make sure laboratory activities are effective.

Three features are worth noting. The clause is about real authority, not a title; resources such as time and access to records are part of it. The duties may be shared among several suitable people. And the phrase irrespective of other responsibilities means a technician or manager with another main job can still hold these duties, provided they can really perform them.

The output is a set of named responsibilities, an escalation path that produces action, and a flow of performance information to management.

Give authority a practical meaning

A person responsible for raising a deviation needs a route that can produce action. If they cannot obtain information, involve the relevant manager or initiate containment, the assignment may be ineffective. Consider the decisions they need to make and the resources they need to discharge the responsibility.

The standard does not require a particular job title or state that one person must perform every listed duty. Responsibilities can be allocated across suitable personnel. The arrangement must still work when an issue crosses departments or challenges a commercial priority.

ISO/IEC 17025 consulting & certification support

Get clause 5.6 right the first time — with a global leader in ISO/IEC 17025 implementation

A Sterling consultant works the requirement through with your team, links it to the rest of the system and carries it to certification readiness. Expert and experienced consultants, 8,100+ client engagements in 60+ countries.

Cover all five functions

For implementation, maintenance and improvement, identify who coordinates changes and follows up weaknesses. For detecting deviations, include departures from the management system and from laboratory procedures. For initiating action, clarify how the person can prevent or reduce the deviation rather than merely filing a report.

Management needs useful information about system performance and improvement needs. Reporting should support decisions about resources and priorities, not just count completed forms. The arrangements must also support effective laboratory activities, linking system responsibilities to the technical work that produces results.

Why authority to act on deviations matters to the business

Deviations are normal in laboratories; unhandled deviations are the problem. A coordinator who spots a drifting check or an obsolete method but cannot act, or must wait for an absent director, turns a small issue into a repeated one that eventually reaches a customer.

Real authority also protects against pressure. When a person is expected to flag problems, but is overruled by commercial priorities, impartiality and result validity both suffer. Making the duties explicit, and providing the time and tools to do them, is among the cheapest ways to reduce rework, complaints and findings.

How to implement clause 5.6

Test authority by asking what the named person could actually do on an average day when something goes wrong.

  1. List the five duties and decide which suitable person or people hold each one, including deputies.
  2. Write what each person may do on their own, such as flagging status, stopping a task or opening a corrective action, and what needs escalation.
  3. Provide the resources they need, including time, system access and a direct route to management.
  4. Define how deviations are recorded and passed into the nonconforming-work and corrective-action processes.
  5. Agree the content and timing of performance reports to management so that they support decisions rather than count forms.
  6. Run scenario tests covering absence, disagreement with a manager and work at a customer site, then adjust.
  7. Check periodically that the people named still hold the time, access and standing to act, especially after reorganisations or changes of workload. Record any gap found and decide who will close it, so the arrangement stays dependable.

Two illustrative authority gaps

Illustrative example 1

A calibration coordinator discovers that equipment returned from repair has not been verified before use. The coordinator has authority to flag the status, involve the responsible technical person and initiate the laboratory's work-control process. A rule requiring approval from the absent commercial director before any action would undermine timely control.

Illustrative example 2

A testing laboratory's document coordinator identifies repeated use of obsolete methods at a remote location. The assigned authority allows the coordinator to initiate correction, escalate the systemic problem and report the resource need to management. Merely emailing a reminder without any route for follow-up is unlikely to solve the weakness.

Automate™ on Effivity · included in every Sterling engagement

Keep clause 5.6 alive in Effivity

Record what you decided under clause 5.6, link it to the records and controls it affects, and let the review date trigger the next look. Effivity is the ISO & GRC software used in 50+ countries — and part of every Sterling ISO/IEC 17025 programme.

Evidence and proportionate implementation

What counts as evidence

Role descriptions, delegated authorities, escalation routes and records of actual actions can demonstrate the arrangement. Clause 5.6 does not prescribe a standalone authority form or require a new committee. Test effectiveness with scenarios drawn from your laboratory, including absence, disagreement and work at customer sites.

Connect this structural requirement with clause 7.10 on nonconforming work and clause 8.7 on corrective action. Those processes determine how technical effects, correction and recurrence are handled. Identifying a person under clause 5.6 does not replace the detailed process or the need for competent technical decisions.

Common mistakes include giving responsibility without time or access, assuming a consultant will notice every deviation, or treating management reporting as an annual administrative exercise. Personnel must be able to fulfil the duties while the laboratory operates, not only during assessment preparation.

Common nonconformities with clause 5.6

Findings linked to this clause usually concern authority that exists on paper only.

  • The person assigned to monitor the system cannot access technical records at remote sites.
  • Deviations are reported but nobody has authority to initiate containment.
  • Reports to management consist of counts of completed forms and no discussion of improvement needs.
  • All duties are assigned to an external consultant instead of laboratory personnel.
  • Staff described as responsible for deviations say they must wait for permission from a commercial director.

Frequently asked questions

Must we appoint a separate quality manager?

Clause 5.6 requires effective personnel responsibilities, authority and resources, not a prescribed title or a separate full-time role in every laboratory.

Can these duties be shared by several people?

Yes, provided the allocation is clear and the combined arrangement performs all required functions. Shared responsibility should not become a gap where nobody acts.

Does identifying a deviation mean the person must decide its technical impact alone?

No. They need authority to initiate the appropriate action and involve competent people. Technical assessment and work-resumption decisions should follow the laboratory's defined responsibilities.

Turn this requirement into reliable laboratory practice

If deviations are reported but remain unresolved, ask Sterling to review the authority and escalation route in a laboratory systems consultation. The agreed work can connect staff responsibilities with effective nonconforming-work and corrective-action processes.

Build the team's understanding through Nonconformity Management. Discuss the relevant scope, employee learning and agreed access to Effivity ISO & GRC automation software with Sterling; laboratory technical decisions remain with competent, authorised personnel.

ISO/IEC 17025 requirements hub · Structural requirements · Nonconforming laboratory work · Corrective action

Source basis and reading note. This is original practical guidance for ISO/IEC 17025:2017. Use an authorised copy for definitive requirements. Illustrative examples describe hypothetical situations, not client results. Implementation methods are distinguished from requirements; independent bodies decide accreditation for a defined laboratory scope outcomes. Issuer standard record: iso.org.
Disclaimer. This guide is provided for general information only. It is not the text of the standard, not legal or professional advice, and not a representation of how any certification body will assess your organisation. Sterling International Consulting accepts no liability for any loss arising from reliance on it. Requirements are applied to each organisation's own context through an engagement; contact us to implement ISO/IEC 17025 in your organisation.