ISO 13485 guide
MDSAP audit readiness: how medical device manufacturers prepare for one audit that five regulators read
What being ready for an MDSAP audit really means, what the Auditing Organization tests first, a six-step readiness sequence for the months before the audit, and how to handle graded findings and the 15-day response period.
Key points
- An MDSAP audit is a regulatory audit of your ISO 13485 quality system plus the requirements of each market in scope, carried out by an Auditing Organization the participating regulators recognise.
- Being ready means more than holding a certificate: the auditor follows a process-based model built on risk management, and the report is written for regulators, not only for you.
- Readiness is proven by records the system has already produced: registrations per market, reportability decisions, design and risk files that connect, and internal audits run the way the Auditing Organization will run its own.
- The work continues after the closing meeting: the regulators set an initial response period of 15 calendar days for your answer to the findings, so plan the people and the evidence before the audit starts.
What MDSAP audit readiness means
A manufacturer is ready for an MDSAP audit when its quality system already runs to ISO 13485:2016 and to the regulatory requirements of every country in its scope, and when it has the records to show it.
The Medical Device Single Audit Program lets one audit serve the regulators of Australia, Brazil, Canada, Japan and the United States. That changes what the auditor is doing. In an ordinary ISO 13485 audit the question is whether the system conforms to the standard. In an MDSAP audit the question includes whether each regulator can rely on what it reads, because the report is written for them.
For many manufacturers the trigger is Canada. Health Canada requires manufacturers of Class II, III and IV devices sold in Canada to hold MDSAP certification, a rule that has applied since 1 January 2019. This guide assumes the decision is made; if it is not, start with MDSAP and ISO 13485: what the single audit adds.
Who audits, and who reads the report
Only an Auditing Organization recognised under the programme can conduct an MDSAP audit. Sterling does not audit and does not certify; the Auditing Organization plans the audit, raises and grades the findings and issues the certificate.
The audience for the report matters to how you prepare. Findings are graded under the programme's guidelines for GHTF/SG3/N19:2012, the nonconformity grading system for regulatory purposes and information exchange, and the graded results are shared with the regulators in your scope.
The United States shows how the report is used. The FDA uses MDSAP audit reports as a substitute for its surveillance inspections for manufacturers that volunteer to take part, and it does not carry out surveillance inspections at sites actively enrolled. Every manufacturer remains subject to the FDA's other inspections, including for-cause and compliance follow-up visits, and FDA inspections under the QMSR do not follow the MDSAP audit plan. The detail of that relationship is in the guide on ISO 13485 and the FDA QMSR: what to check.
What the auditor will look for
The programme's audit approach is process-based. It focuses on a set of defined processes, links them in a defined way and builds all of them on a foundation of risk management. In practice the auditor follows the thread from management into design, production, purchasing and post-market activity. The audit model itself, process by process, is covered in the MDSAP hub's own guide (The MDSAP audit model explained, process by process). The table is a readiness view: what to expect in each area and the evidence to have ready.
| Area | What the auditor tests | Evidence to have ready |
|---|---|---|
| Management and risk planning | Whether leadership reviews performance, plans risk management and tracks regulatory change per market | Management review minutes with decisions, a risk management plan and regulatory updates reviewed |
| Market authorisations and registrations | Whether each device is authorised where it is sold and changes were assessed for a new submission | An authorisation register per device and market, and change records that ask the regulatory question |
| Design and development | Whether risk management runs through the design project and whether requirements trace to verification, validation and risk controls | Design files for a sampled project, the linked risk file, design reviews and change records |
| Production and service controls | Whether processes are validated, risk controls are implemented on the line, and products are identified and traceable | Validation reports, batch and sterilisation records where they apply, calibration and distribution records |
| Purchasing | Whether suppliers are controlled in proportion to the risk they carry to the device | A supplier list with risk ratings, quality agreements with critical suppliers, and monitoring and re-evaluation records |
| Feedback, complaints and reporting | Whether complaints are investigated, reportability is decided against each market's rules, and CAPA closes the loop into risk management | The complaint file with reportability decisions and reasons, CAPA verified effective, and trend analysis |
If your internal audit programme cannot produce this evidence on request, the gap is in the system rather than in the preparation. The guide on ISO 13485 internal audit: planning, conduct and reporting covers how to build a programme that finds it first.
A readiness sequence for the months before the audit
Work backwards from the audit date. Durations depend on how much of the system already runs and how many markets are in scope.
1. Fix the scope in writing
List the device families, sites and the countries where you sell or will sell during the certificate's life. The jurisdictions decide which regulatory requirements the auditor examines.
2. Build a jurisdiction matrix
For each country, record the requirements that go beyond ISO 13485, where each is met in your procedures and who owns it. It shows the auditor that regulatory obligations belong to a process, not to one person's memory.
3. Let the system generate records
New or changed procedures need to run before the audit so that complaint decisions, change assessments, supplier reviews and CAPAs exist as records of real work.
4. Audit internally the way the Auditing Organization will
Run the internal audit along the same processes and grade your own findings with the same logic the programme uses. Close them with evidence and take the results to a management review that covers regulatory change in every market.
5. Hold a rehearsal
A mock audit a few weeks before the date tests people as much as paperwork. Process owners should be able to walk an auditor from a requirement to its record without a script, and document retrieval should be tried once before the real day.
6. Plan the response capacity
Reserve the time of the people who will answer findings in the weeks after the audit. The regulators have set an initial response period of 15 calendar days.
Findings, grading and the response window
Every nonconformity in an MDSAP audit is graded, and the grade travels with the report to the regulators. The programme publishes its guidelines on the GHTF/SG3/N19:2012 grading system and a nonconformity assessment rubric, and both are worth reading before the audit so that your internal auditors grade the same way. Look first for repeat findings and for any control failure that let a nonconforming device reach the market.
After the closing meeting, the clock starts. Your initial response to the findings is due within the 15 calendar day period the regulators have imposed. A useful response names the correction, the root cause, the corrective action, the owner and the date, and it attaches evidence wherever the action is already complete.
The certificate follows the Auditing Organization's decision once findings are addressed; the general mechanics of certification are in ISO 13485 certification process, step by step.
Where MDSAP readiness breaks down
The same weaknesses appear again and again when a certified ISO 13485 system meets an MDSAP audit for the first time.
- Registrations held outside the system. Licences are known to regulatory affairs but absent from the quality system and from change control.
- Reportability decided but not recorded. The decision not to report an event, and its reasoning per country, is missing from the file.
- Risk management that stops at design transfer. The risk file has not been updated since launch, although complaints and CAPAs carry risk information.
- Suppliers controlled by paperwork alone. Critical suppliers are monitored no differently from minor ones.
- Internal audits that never grade. The first time anyone grades a finding is when the auditor does.
How Sterling prepares you for the MDSAP audit
One system, ready for five regulators on the day
Sterling's expert and experienced consultants build the jurisdiction matrix with your regulatory and quality teams, close the gaps between your ISO 13485 system and each market in scope, run a graded internal audit and a mock audit, and stay with you through the response to the findings. Records live in Effivity, used in 50+ countries. Sterling has supported 8,100+ client engagements in 60+ countries since 2003. The Auditing Organization audits and issues the certificate. We ensure successful certification for our clients.
Book a free discovery callMDSAP audit readiness: questions buyers ask
How do we know we are ready for an MDSAP audit?
You are ready when an internal audit run along the programme's processes, and graded the way the Auditing Organization grades, finds no significant gaps and every open finding is closed with evidence. The jurisdiction matrix should be complete and the records should come from months of real work.
How long does it take to prepare for an MDSAP audit?
It depends on where you start: in Sterling's experience, extending a well-run ISO 13485 system for one or two markets takes around four months, while a company building its system and entering several markets at once should plan for up to a year.
Is an ISO 13485 certificate enough to sell Class II devices in Canada?
No. Health Canada requires manufacturers of Class II, III and IV medical devices sold in Canada to hold MDSAP certification, and has done so since 1 January 2019. An ISO 13485 certificate on its own does not meet that requirement.
Will the FDA still inspect us if we are enrolled in MDSAP?
Not for routine surveillance, but other inspections continue. The FDA uses MDSAP audit reports in place of its surveillance inspections for enrolled manufacturers, while for-cause, compliance follow-up and other non-surveillance inspections still apply to every manufacturer.
What happens in the 15 days after the MDSAP audit?
You prepare and submit your initial response to the findings within the 15 calendar day period the regulators have set. Name the people who will write it before the audit starts.
Can Sterling run a mock MDSAP audit before the real one?
Yes. Sterling runs a graded internal audit and a rehearsal of the audit day with your process owners, so findings are raised by us first and closed before the Auditing Organization arrives. Sterling does not audit for the programme or issue certificates; the recognised Auditing Organization does both.
More ISO 13485 guides
Every guide in the ISO 13485 series is written for one question and links back to the hub for the whole picture.
- ISO 13485 case study
- ISO 13485 certification process, step by step
- ISO 13485 certification cost: what moves the price
- The medical device file and the design file: what goes in them
- Effivity for ISO 13485: the guide
- ISO 13485 internal audit: planning, conduct and reporting
- ISO 13485 and the FDA QMSR: what to check
- ISO 13485 vs ISO 9001: what the device standard adds
- ISO 13485 requirements explained, clause by clause
- ISO 13485 training: who needs what
Keep exploring
Explore more about ISO 13485
Watch a video on how to implement ISO 13485 here.
Watch a video on ISO 13485 requirements here.
ISO 13485 resources
Services for ISO 13485
Industries
Talk to a consultant
Ask how to get your ISO 13485 system ready for its first MDSAP audit.
Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.
hello@sterling-grc.com+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page
What would you like to achieve?
Choose a starting point. The enquiry form takes about a minute.
Book my free discovery callContinue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice