SOC 2 guide
SOC 2 implementation plan: phases, owners and deliverables, from scoping to the Type 2 examination period
How to run a SOC 2 project: seven phases from scoping and category selection to the Type 2 examination period, the deliverable and owner for each, the roles you need, when to engage the CPA firm, and the habits that stall projects.
Key points
- A SOC 2 project runs in seven phases: scoping and category selection, gap analysis, control design and remediation, evidence collection, readiness assessment, a Type 1 as at a date where one is wanted, and the Type 2 examination period followed by fieldwork.
- Every phase needs a named owner and a defined deliverable. The executive sponsor, the compliance lead and the control owners carry the plan; engineering, HR and the vendor owner produce most of the evidence.
- Engage the service auditor, a licensed CPA firm, once scope and report type are settled and before the readiness assessment, so that the examination period is agreed rather than assumed.
- Two habits stall more projects than any technical gap: choosing a compliance tool before the controls are designed, and leaving evidence collection until the end.
How a SOC 2 project is structured
A SOC 2 implementation plan exists to reach the start of an examination period with controls that are designed, operating and producing dated records, then to keep them running for the whole period the service auditor tests. Policies are the small part; changing how access, change, incidents, vendors and people are handled, and proving it, is the large part.
The plan runs in seven phases. Some overlap, and evidence collection never ends. Each phase closes with a gate where the sponsor confirms the next can begin; projects that drift past the gates tend to discover at fieldwork that a control was never switched on.
How long each stage takes is covered in the SOC 2 timeline guide, and what phase two examines in the SOC 2 gap analysis guide. This guide covers who does what, in what order, and what each phase hands on.
The seven phases, with owners and deliverables
An illustrative plan for a service organisation with a capable technical team, one cloud environment and Security plus one further category. The weeks are a planning shape, not a promise.
| Phase | Weeks (illustrative) | Deliverables | Accountable owner |
|---|---|---|---|
| 1. Scoping and trust services category selection | 1 to 3 | System boundary, services and locations in scope, categories chosen, report type and target date, project charter | Executive sponsor, with the compliance lead |
| 2. Gap analysis | 3 to 6 | Control matrix mapped to the criteria, gap register, prioritised remediation plan with owners and dates | Compliance lead |
| 3. Control design and remediation | 5 to 16 | Policy set approved, procedures written, technical controls configured, risk assessment and vendor inventory complete, first draft of the system description | Control owners, engineering and IT |
| 4. Evidence collection | From about week 8, continuing | Evidence calendar, a record for every control occurrence, awareness training completed and recorded | Control owners, HR, vendor owner |
| 5. Readiness assessment | 16 to 20 | Control-by-control test results, exceptions corrected, go or no-go decision on the period start | Compliance lead, with the independent tester |
| 6. Type 1 (where required) | Around 20 to 24, then the CPA firm's reporting time | Management's assertion and system description as at the report date; Type 1 report issued by the CPA firm | Executive sponsor signs; CPA firm reports |
| 7. Type 2 examination period and fieldwork | A period of typically six to twelve months, then fieldwork | Controls operating without interruption, evidence requests answered, final description and assertion, Type 2 report | All owners; CPA firm examines and reports |
Phases three and four overlap on purpose: once a control is designed, its owner starts producing its record, because early records expose the problems, such as a review nobody booked or a leaver whose access lasted a week too long.
Decision points between phases
- End of phase 1: categories, system boundary and report type are fixed. Changing them later reopens the gap analysis. The SOC 2 scope guide covers how to set the boundary.
- End of phase 2: the remediation plan, engineering budget and support route are approved.
- End of phase 5: the sponsor decides whether the controls are stable enough to start the examination period, or whether a short further run is needed.
- Before fieldwork: management reviews and approves the system description and signs its assertion.
The roles a SOC 2 project needs
The criteria for the control environment, communication, risk assessment and monitoring reach into management, HR and procurement, so the plan names people outside engineering from the first week.
| Role | What they own in the plan | What the service auditor will look for |
|---|---|---|
| Executive sponsor | The decision to proceed, the budget, the gates between phases, the assertion over the system description | Evidence of management oversight of security and of the risk assessment |
| Compliance lead | The project plan, the control matrix, the evidence calendar, coordination with Sterling and the CPA firm | A single point of contact who can locate any record requested |
| Control owners | Operating each control on schedule and keeping its record | Walkthrough answers that match the written procedure, and dated evidence across the period |
| Engineering and IT | Access management, logging and monitoring, change management, vulnerability remediation, backups and recovery | System-generated records: tickets, approvals, alerts, scan results, restore tests |
| HR | Background checks, onboarding and offboarding, policy acknowledgements, awareness training, disciplinary process | Joiner and leaver records sampled against access changes |
| Vendor owner | Vendor inventory, risk assessments, contracts with security terms, review of subservice organisations' reports | Assessments dated within the period and follow-up on anything the vendor reports flagged |
In small organisations one person may hold several roles, provided nobody reviews a control they operate. The SOC 2 governance guide explains how oversight and control ownership are recorded; the SOC 2 vendor management guide covers the vendor owner's work in depth.
Where the service auditor comes into the plan
The service auditor is the licensed CPA firm that examines your controls and issues the report, independently of whoever designed them; Sterling prepares you but never performs the examination or issues the report.
The right moment to engage the firm is after phase one, once you know the categories, the system and whether you need a Type 1, a Type 2 or both, and before the readiness assessment. You can then agree the period's start and length, the firm's expectations for the description and evidence, and fieldwork dates. Selecting the firm itself, and the questions to put to it, is the subject of the guide on choosing a SOC 2 service auditor.
Fieldwork after the period is covered in the guide to the SOC 2 examination.
Design™ and Drive™: two ways to staff the same plan
The phases, gates and deliverables do not change with the level of support you choose. What changes is who carries the work between the gates. Design™ and Drive™ are alternatives; you choose one for the engagement according to the capacity of your team, not one after the other.
- Design™ (guided): your compliance lead and control owners do the implementation work, using Sterling's control library, policy templates, workshops and review. Sterling checks each deliverable against the criteria before the gate.
- Drive™ (managed): Sterling's consultants take on the agreed consulting and documentation work: drafting policies and the system description, building the control matrix, running the evidence calendar and chasing owners for records. Your people still operate the controls, and management still approves the description and signs its assertion.
How Sterling runs a SOC 2 engagement
A plan with owners, gates and evidence from the first week.
Sterling's expert and experienced consultants set up the plan with your sponsor, run the gap analysis, and then support the phases through Design™ or Drive™, whichever fits your team. The control set and the evidence calendar live in Effivity, included with the engagement, at no additional cost, so every owner can see what is due and the CPA firm samples records that were produced as the controls ran. Before the period begins, Sterling tests each control the way the examiner will. We ensure a successful SOC 2 examination for our clients. The report and its opinion come from the independent CPA firm you engage; Sterling does not issue the report.
Book a free discovery callWhat stalls SOC 2 projects
- Tool-first purchasing. A platform chosen before scope and controls are settled imposes a generic control set, and teams spend weeks configuring integrations for controls they do not operate. Design the controls first, then choose automation.
- Evidence collected only at the end. A Type 2 samples events across the period; records reconstructed in the final month are incomplete and easy to recognise. Start the evidence calendar the week each control goes live.
- One person carrying the programme. When the security lead also runs infrastructure, the project pauses whenever production needs attention. Name control owners across teams and give the compliance lead protected time.
- Starting the period before the controls are stable. Every failure during the period can become an exception in the report. The readiness assessment exists to decide when to start, not to confirm a date already promised to a client.
- Treating the Type 1 as the finish line. Without a Type 2 plan, controls lapse after the first report. See SOC 2 common mistakes.
SOC 2 implementation plan: questions buyers ask
Who should act as the compliance lead?
Someone who understands the systems in scope, has the authority to chase owners across teams and has time set aside for the project.
When should we sign the engagement letter with the CPA firm?
After the scope, categories and report type are fixed, and before the readiness assessment. That order lets you agree the examination period with the firm and book fieldwork, rather than starting a period the firm has not yet accepted.
Do we need a compliance automation platform to run the plan?
Not necessarily. What the examiner needs is dated, complete evidence tied to each control. In a Sterling engagement the control set and evidence are held in Effivity.
Can engineering deliver SOC 2 while continuing product work?
Yes, if remediation items enter normal sprint planning with owners and dates and the compliance lead reviews progress at a fixed cadence.
How does adding availability or confidentiality change the plan?
Each category adds controls, evidence and often owners, such as recovery testing for availability or disposal for confidentiality. The phases stay the same; phases two to four grow.
What happens if a control fails during the examination period?
Record it, correct it, find the cause and keep evidence of the fix. The CPA firm may still report an exception, but a documented response reads very differently from a gap found at fieldwork. The guide to SOC 2 exceptions and qualified opinions explains the consequences.
More SOC 2 guides
Every guide in the SOC 2 series is written for one question and links back to the hub for the whole picture.
- SOC 2 cost: what moves the price
- SOC 2 governance
- SOC 2 for healthcare IT and health BPO
- SOC 2 for payroll companies, HR platforms and staffing firms
- SOC 2 in India
- SOC 2 for managed service providers and data centres
- SOC 2 in the Netherlands and Europe
- SOC 2 policies and evidence: what you need and what you do not
- The SOC 2 system description: what to write and what to leave out
- SOC 2 Trust Services Criteria explained, criterion by criterion
- SOC 2 Type 1 vs Type 2: which report, and when
- SOC 2 vs ISO/IEC 27001: which one, or both?
Keep exploring
Explore more about SOC 2
Watch a video on how to implement SOC 2 here.
Watch a video on SOC 2 requirements here.
SOC 2 resources
Services for SOC 2
Industries
Talk to a consultant
Plan your SOC 2 implementation with owners and dates that hold.
Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.
hello@sterling-grc.com+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page
What would you like to achieve?
Choose a starting point. The enquiry form takes about a minute.
Book my free discovery callContinue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice