ISO/IEC 42001 guide
ISO 42001 nonconformities: major and minor findings in an AIMS audit, and how to close them
Clause by clause: ISO 42001 Clause 10.2: Correct AIMS Nonconformities and Address Their Causes →
How a certification body grades an ISO/IEC 42001 finding, where AIMS nonconformities usually arise, how one is written, correction versus corrective action, the evidence that closes it, six typical findings and what an open major costs.
Key points
- An ISO/IEC 42001 certification body grades each finding under ISO/IEC 17021-1: a major nonconformity affects the capability of your AI management system to achieve its intended results, a minor one does not.
- AIMS findings cluster where the documents stop agreeing with each other: a risk register, Statement of Applicability and impact assessments that describe different systems, or assessments not repeated after a model changed.
- Every finding runs through clause 10.2, Nonconformity and corrective action: correct the instance, find the cause, remove it and check that the fix worked.
- The certification body sets the response deadline. A major must be verified as closed before any certificate is granted; if that has not happened within six months of the last Stage 2 day, Stage 2 is repeated.
Major and minor: how an AIMS finding is graded
A nonconformity is a requirement not met, whether it comes from ISO/IEC 42001, a control declared in your Statement of Applicability or your own procedure. Certification bodies that audit an AIMS are accredited to ISO/IEC 17021-1, with ISO/IEC 42006 adding requirements specific to AI management systems, and ISO/IEC 17021-1 defines the two grades.
A major nonconformity is one that affects whether the management system can achieve its intended results. Two situations can push a finding into that grade: serious doubt that a process is under effective control, or several minors against the same requirement that together show the system failing rather than one lapse. A minor is a real gap that leaves the system able to work. An opportunity for improvement is neither, and needs no formal response.
Where ISO/IEC 42001 findings usually arise
The standard links its core records tightly, so findings cluster. Clause 6.1.3 expects the controls you selected to be compared with the 38 in Annex A, recorded in a Statement of Applicability with a justification for each inclusion and exclusion, and a treatment plan approved by designated management with the residual risk it accepts. Clauses 8.2 and 8.4 expect both assessments repeated at planned intervals and on significant change.
- Records that disagree: a registered risk with no matching control, or a control marked implemented that no record reflects.
- Assessments frozen at launch: a model retrained, a new data source added or a use extended, with no reassessment on file.
- Supplier blind spots: a third-party model used with no allocation of responsibilities.
The audit questions guide lists what auditors ask in each area, and the Stage 1 and Stage 2 guide explains when.
How an auditor writes a nonconformity
Accredited certification rules require every nonconformity to name the specific requirement, give a clear statement of what is wrong, and identify in detail the objective evidence behind it. An AIMS example:
- Requirement: clause 8.4, AI system impact assessment: assessments are repeated at planned intervals or when significant changes are proposed or occur.
- Evidence: the customer-support chatbot moved to a new underlying model and began answering billing queries; its latest impact assessment predates both changes.
- Statement: the organisation could not show that the impact of significant changes to an in-scope AI system had been reassessed.
The auditor must discuss each finding with you so the evidence is right: the moment to produce a reassessment that exists but was not shown. The auditor may not suggest the cause or the fix.
Correction, root cause and corrective action under clause 10.2
ISO/IEC 42001 follows the harmonised structure, so clause 10.2, Nonconformity and corrective action, carries the same logic as other management system standards. It applies however the nonconformity surfaced: audit, complaint, incident or internal audit. Taking the chatbot finding above:
Correction: deal with this case
Assess the chatbot's impact as it now runs. Feed its results into the risk assessment, as clause 6.1.4 requires, and update the treatment plan and Statement of Applicability if new controls are needed. Deal with consequences already visible, such as billing answers given without the checks now required.
Root cause: why did it happen?
Here, the engineering change process approved model and knowledge-base changes on technical grounds and had no step that told the AIMS lead. Then check whether other systems changed the same way.
Corrective action: remove the cause
Add a reassessment trigger to the change process, with criteria for what counts as significant, and a check at each release that the impact assessment is current. Review whether it worked at the next change, and keep the record.
The deadline and the evidence that closes it
The certification body, not the standard, sets the time you have. At the closing meeting it tells you the timeframe for presenting your plan for correction and corrective action. It then reviews your causes and actions and verifies them by an additional full or limited audit, or by documented evidence confirmed later. A major is verified before the certification decision; for a minor, an accepted plan is normally enough then.
Evidence that closes an AIMS finding shows what has changed, not what is planned:
- the missing assessment or approval, dated after the audit and signed by someone with authority;
- the changed procedure or template, under a new revision;
- the first records produced under it, such as a change ticket that triggered a reassessment;
- for effectiveness, a sample from the other systems showing the gap was not repeated elsewhere.
Six typical ISO/IEC 42001 nonconformities and their fixes
These are composites, not extracts from any report. Grades assume an isolated case and rise when the pattern repeats.
| Finding | Requirement and typical grade | Correction | Corrective action |
|---|---|---|---|
| An AI-assisted screening tool used by HR is missing from the AI system inventory and the scope | Clause 4.3, scope of the AIMS Minor; major if several systems are missing | Add the system; assess its risks and impacts | Procurement and IT onboarding ask whether a new tool uses AI |
| The treatment plan and residual risk were never approved by designated management | Clause 6.1.3, AI risk treatment Minor; major if no plan is approved at all | Obtain approval; record who accepted which risk | Approval authority defined; plan changes routed to it |
| A retrained credit-scoring model went live with no fresh risk or impact assessment | Clauses 8.2 and 8.4 Minor; major if repeated across systems | Reassess the model as deployed | Change process triggers reassessment on defined criteria |
| Training data for a classifier came from a supplier with no record of source or checks | Annex A data controls, as declared in the Statement of Applicability Minor | Document provenance and quality checks for the dataset | Data acquisition procedure requires both before use |
| A vendor's foundation model is embedded in a product; no agreement allocates responsibilities | Clause 8.1, externally provided services Minor; major if outsourced AI is uncontrolled | Agree and record responsibilities with the vendor | Supplier evaluation covers AI responsibilities before contract |
| The internal audit programme covered clauses 4 to 10 but none of the declared Annex A controls | Clause 9.2, internal audit Minor or major, by how much was missed | Audit the controls before the response date | Programme spans clauses and controls, weighted by risk |
What happens if a major stays open
At initial certification
No certificate is granted while a major is open. If the certification body cannot verify the correction and corrective action within six months after the last day of Stage 2, it has to carry out another Stage 2 before it can recommend certification.
During the certificate's life
An organisation that fails to meet certification requirements, for instance by leaving a major open past its deadline, can be suspended. A suspended certificate is temporarily invalid; unresolved, suspension leads to withdrawal or a reduced scope.
At recertification
Majors raised at recertification must be corrected and verified before the certificate expires, or it is not renewed. It can be restored within six months of expiry once the outstanding work is done; after that, at least a Stage 2 is needed. The surveillance and recertification guide covers the whole three-year cycle.
How to keep AIMS findings few, and minor
Most AIMS majors are predictable: a stale inventory, frozen assessments, or an internal audit that skipped the controls. Walk one system from inventory to impact assessment before the auditor does, and close actions with records rather than dates. The internal audit guide explains how to audit an AIMS yourself, and the common mistakes guide covers the ten that most often fail audits.
How Sterling handles AIMS findings
Findings raised by us first, and closed with evidence.
Sterling's consultants audit your AIMS across clauses and Annex A controls before the certification body arrives. If the Stage 2 auditor raises a finding, we work through the cause with the system owner, help you write a response the reviewer can follow, and hold the evidence in Effivity, included with the engagement at no additional cost. We ensure successful certification for our clients. The accredited certification body grades findings and decides; Sterling does not certify.
Book a free discovery callISO/IEC 42001 nonconformities: questions buyers ask
Is there a maximum number of minor nonconformities for ISO 42001 certification?
No maximum is set by ISO/IEC 17021-1. Before the decision, every major must be verified as closed and a plan accepted for every minor. Several minors against the same requirement can, however, be graded together as one major.
Can an AI incident become a nonconformity?
An incident becomes a nonconformity when it shows a requirement was not met, such as a control that did not operate or a change that bypassed reassessment. Handled through clause 10.2, with the cause found and fixed, it becomes evidence that the system works.
Is a missing Annex A control automatically a nonconformity?
No, provided the Statement of Applicability excludes it with a justification the risk assessment supports. A control declared as applicable but not operating, or an exclusion with no reason, is a nonconformity.
Do internal audit findings count against us at Stage 2?
No. Auditors expect your internal audit to find gaps and look at whether each one went through clause 10.2 with its cause analysed and effectiveness checked. Well-closed internal findings count in your favour.
Can we challenge a nonconformity raised in an ISO 42001 audit?
Yes, on the facts: during the audit, show the record that proves the requirement was met. Accredited certification bodies also run a formal appeals process.
More ISO/IEC 42001 guides
Every guide in the ISO/IEC 42001 series is written for one question and links back to the hub for the whole picture.
- AI system impact assessment, with ISO/IEC 42005
- ISO/IEC 42001 Annex A: the 38 controls explained
- ISO/IEC 42001 certification process, step by step
- ISO/IEC 42001 certification cost: what moves the price
- ISO/IEC 27001 to ISO/IEC 42001: extending an ISMS into an AIMS
- ISO 42001 internal audit
- ISO 42001 management review
- ISO/IEC 42001 certification in the Netherlands and Europe
- ISO 42001 for professional services
- ISO/IEC 42001 requirements explained, clause by clause
- ISO 42001 for retail and e-commerce
- ISO/IEC 42001 and the EU AI Act: what the certificate does not give
Keep exploring
Explore more about ISO/IEC 42001
Watch a video on how to implement ISO 42001 here.
Watch a video on ISO 42001 requirements here.
ISO/IEC 42001 resources
Services for ISO/IEC 42001
Talk to a consultant
Prepare for your ISO/IEC 42001 audit with findings closed before it starts.
Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.
hello@sterling-grc.com+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page
What would you like to achieve?
Choose a starting point. The enquiry form takes about a minute.
Book my free discovery callContinue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice