ISO/IEC 42001 guide
ISO 42001 checklist: every ISO/IEC 42001 requirement and Annex A control in the order you will meet them, with the evidence auditors look for
Clause by clause: ISO/IEC 42001:2023 requirements: every clause explained →
A 53-item ISO/IEC 42001:2023 checklist from context to improvement, including the Annex A controls, in the order an AI management system project meets them, with the evidence certification auditors usually sample and double weight on fourteen items where findings most often arise.
Key points
- Fifty-three checks cover clauses 4 to 10 of ISO/IEC 42001:2023 and the Annex A reference controls, arranged in the sequence an AI management system project usually reaches them, each with the evidence a certification auditor is likely to sample.
- The heart of the standard is three linked pieces of work: the AI risk assessment, the AI system impact assessment and the risk treatment that ends in a Statement of Applicability. Most of the double-weighted items sit around them.
- Fourteen items count twice. They are the points where, in Sterling's experience of management system audits, findings most often arise: the AI system inventory, risk and impact work, the Statement of Applicability, reassessment after change, suppliers, data, competence, internal audit, management review and corrective action.
- Ticking every box is not certification. An independent certification body, accredited for this standard, audits and decides; Sterling does not certify.
How to use this checklist
Work from the top. The sections run from context to improvement, with the Annex A controls placed after clause 8, because that is where the controls chosen in your risk treatment are put into operation. Within each section the items follow the order in which a project normally meets them, so the numbering of the standard is a guide rather than a rule.
Three pieces of work start earlier than their position suggests. The AI system inventory comes first of all, since nothing else can be scoped, assessed or controlled without it. Document control from clause 7 is needed as soon as the first policy is drafted. And the route for nonconformities and corrective action from clause 10 should be running before the controls begin to operate, because what goes wrong in those months is exactly what the auditor will ask about.
Tick an item only when the evidence line under it exists and reflects the way AI systems are actually built, bought and used here. A risk method that nobody has applied, or an impact assessment written after the system went live and never revisited, is still an open item. For Annex A, tick a control either when it operates or when your Statement of Applicability excludes it with a justification you could defend in front of an auditor.
The progress bar counts the double-weighted items twice, so it tracks preparation, not the result of an audit. Ticks are saved in this browser on this device only; use print or save as PDF to share progress with your team, and reset to begin again.
What this checklist is not
A completed list can create false confidence. Keep these four distinctions in mind.
- It is not the readiness check. Sterling's free online readiness check gives a quick view of where you stand before a project begins. This page is the working inventory used during the project itself.
- It is not a gap analysis. The gap analysis, Sterling's first engagement stage, looks at documents, practice, records and people against every requirement and control, then returns a prioritised action plan. A tick cannot tell you whether a data science team actually follows the procedure it approved; interviews and sampling can.
- It is not the Stage 1 readiness review. That review belongs to the certification body and is carried out under its own accreditation rules.
- It is not the standard. Each line paraphrases a requirement or a control in plain English. ISO/IEC 42001:2023, obtainable from ISO, IEC and national standards bodies, is the reference an auditor uses.
Clause 4: Context of the organisation
Before any policy is written, establish which AI systems exist, what role you play for each and what people outside the organisation expect of them. Most AIMS projects discover more systems at this stage than anyone predicted.
Clause 5: Leadership
Leadership work gives the AIMS its authority. Without it, the impact assessment becomes a paper exercise owned by a single enthusiast.
Clause 6: Planning
This is the longest section and the one that carries most audit weight. Treat the risk assessment, the impact assessment and the risk treatment as one connected chain: a weakness in one shows up in the other two.
The method behind these items has guides of its own: ISO/IEC 42001 AI risk assessment and treatment, with ISO/IEC 23894 and AI system impact assessment, with ISO/IEC 42005.
Clause 7: Support
Support items are the ones auditors confirm by talking to people. They ask engineers, product owners and procurement staff what the AI policy means for their own work.
Clause 8: Operation
Operation is where plans become records. The auditor wants proof that assessments are repeated as systems change and that the treatments you chose have had an effect.
Annex A: the reference controls in operation
Annex A holds 38 reference controls in nine groups, and Annex B gives guidance on implementing them. Only the controls your Statement of Applicability includes need to operate; for the rest, the justification is the evidence.
Clause 9: Performance evaluation
Evaluation proves the AIMS works as a system rather than as a set of documents. Leave room in the plan for one full internal audit and a management review before the certification audit.
The detail of both activities is covered in ISO/IEC 42001 internal audit: auditing an AI management system and ISO/IEC 42001 management review: inputs, outputs and the record.
Clause 10: Improvement
Improvement closes the loop. Treat AI incidents, complaints and audit findings through one route, so that nothing is fixed on the surface and then forgotten.
What should be ready for Stage 1, and working by Stage 2
The initial certification audit runs in two stages. At Stage 1, the readiness review, the certification body checks that your AIMS is designed and documented and that the audit can go ahead. At Stage 2 it tests whether the system operates, by sampling AI systems, records and people. Use the table to set a target for each section.
| Section | Ready for Stage 1 (readiness review) | Working by Stage 2 (certification audit) |
|---|---|---|
| 4 Context | AI system register, roles and scope statement complete | The systems the auditor samples appear in the register with the stated role |
| 5 Leadership | AI policy approved; AIMS lead and system owners appointed | Top management can explain the policy and the AI decisions it has taken |
| 6 Planning | Risk method, risk register, impact assessments, Statement of Applicability and approved treatment plan | All of them agree with each other and with the systems actually in use |
| 7 Support | Competence defined; documents under control | Competence records for the people sampled; staff explain their part in interview |
| 8 Operation | Controls assigned; suppliers listed; reassessment triggers defined | Reassessments after real changes; verified treatments; supplier controls applied |
| A Annex A | Included controls have owners; exclusions justified | Life-cycle, data, logging and user-information records exist for sampled systems |
| 9 Evaluation | Measures set; internal audit and management review planned and started | A full audit cycle and a management review completed, with decisions |
| 10 Improvement | Corrective action route open | Causes found and actions verified as effective |
If a row is not yet in the Stage 2 column, it is usually cheaper to move the audit date than to face a finding. What auditors do at each stage is set out in ISO/IEC 42001 Stage 1 and Stage 2 audits: what auditors check, and the most frequent failures in ISO/IEC 42001 common mistakes: the ten that fail audits.
How Sterling works through the checklist with you
Every open item given an owner, a date and real evidence before the certification body arrives.
Sterling's expert and experienced consultants start with a gap analysis against every clause and Annex A control, build the AI system register, the risk and impact assessments and the Statement of Applicability with your people, and hold the evidence in Effivity, included with the engagement at no additional cost. We run the internal audit and raise findings ourselves first, so they are closed before Stage 1. We ensure successful certification for our clients.
Book a free discovery callISO 42001 checklist: questions buyers ask
Is there a free ISO 42001 checklist I can use?
Yes: this page is free and interactive, covering clauses 4 to 10 and the Annex A controls in 53 items with the evidence for each. It saves your ticks in your browser and can be printed or saved as a PDF for your team.
Do we have to implement all 38 Annex A controls?
No. You compare your necessary controls with Annex A, then your Statement of Applicability records which controls are included and why any are excluded. Annex A is not exhaustive either, so you may need controls of your own.
Can we use our ISO 27001 checklist for ISO 42001?
Only in part. The shared management system clauses, such as document control, internal audit and management review, carry across, but the AI risk assessment, the impact assessment and the Annex A controls on data, life cycle and use are specific to ISO/IEC 42001. The guide on extending an ISMS covers the overlap.
Which items do certification auditors look at most closely?
The chain from the AI system register to the risk assessment, the impact assessments, the Statement of Applicability and the treatment plan gets the closest attention, because every other part of the AIMS depends on it. Reassessment after change and control of third-party models and data follow close behind.
How long does it take to complete every item on the checklist?
Typically four to eight months for a whole certification project, depending on the number of AI systems, whether a management system already exists and how much time your people can give. Organisations extending an existing ISO/IEC 27001 system usually sit at the shorter end.
Does a fully ticked checklist mean we will pass the certification audit?
No. It shows your own view of readiness; the certification body reaches its decision by sampling systems, records and people at Stage 1 and Stage 2. An internal audit and a gap analysis test the ticks before the auditor does.
More ISO/IEC 42001 guides
Every guide in the ISO/IEC 42001 series is written for one question and links back to the hub for the whole picture.
- AI system impact assessment, with ISO/IEC 42005
- ISO/IEC 42001 Annex A: the 38 controls explained
- ISO 42001 benefits
- ISO 42001 for BPO and shared services
- ISO/IEC 42001 certification process, step by step
- ISO 42001 certification body
- ISO 42001 common mistakes
- ISO/IEC 42001 certification cost: what moves the price
- Effivity for ISO/IEC 42001: the guide
- ISO/IEC 27001 to ISO/IEC 42001: extending an ISMS into an AIMS
- ISO/IEC 42001 requirements explained, clause by clause
- ISO/IEC 42001 and the EU AI Act: what the certificate does not give
Keep exploring
Explore more about ISO/IEC 42001
Watch a video on how to implement ISO 42001 here.
Watch a video on ISO 42001 requirements here.
ISO/IEC 42001 resources
Services for ISO/IEC 42001
Talk to a consultant
Work through the ISO/IEC 42001 checklist with an expert beside you.
Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.
hello@sterling-grc.com+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page
What would you like to achieve?
Choose a starting point. The enquiry form takes about a minute.
Book my free discovery callContinue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice