How certification bodies grade ISO 14001 nonconformities, how an environmental finding is written, correction versus corrective action under clause 10.2, the evidence that closes a finding, eight typical findings and what an open major costs.

  • Updated September 2026
  • 8-minute read
  • Part of the ISO 14001 hub

Key points

  • ISO 14001 nonconformities come in two grades, set out in ISO/IEC 17021-1: a major one undermines the ability of your environmental management system to deliver its intended results, and a minor one does not.
  • Each finding is answered the same way, following ISO 14001:2026 clause 10.2: contain it, find the cause, remove the cause and then check that the action worked.
  • Your certification body, not the standard, fixes how long you have to respond. Majors must be verified before any certificate is issued; minors need an accepted action plan.
  • A major that stays open stops initial certification, can trigger a repeat Stage 2 and can lead to suspension or non-renewal of an existing certificate.

Major or minor: how an environmental finding is graded

A nonconformity is simply a requirement that has not been met, whether it comes from ISO 14001 or from your own system, such as a monitoring frequency in a permit procedure. ISO/IEC 17021-1, the standard against which certification bodies are accredited, defines both grades. A major nonconformity "affects the capability of the management system to achieve the intended results"; a minor one leaves that capability intact.

For an EMS, a gap that leaves a permit limit unmonitored weighs far more than a late signature. The accreditation standard points to two routes to a major: serious doubt that a process is effectively controlled, and a cluster of minors against the same requirement that together reveal a systemic failure. An opportunity for improvement sits outside both grades: it needs no formal reply and does not affect the certification decision.

How a nonconformity is written

Under the accreditation rules each finding must name the requirement concerned, state the nonconformity clearly and identify the objective evidence in detail. A well-formed ISO 14001 finding therefore reads in three parts:

  • Requirement: clause 9.1.2, Evaluation of compliance: the organisation evaluates whether its compliance obligations are met and keeps evidence of the results.
  • Evidence: the site's discharge consent sets quarterly effluent sampling; results were available for two of the last four quarters, and no evaluation of compliance had been recorded for the consent this year.
  • Statement: the organisation could not show that it had evaluated fulfilment of its discharge consent conditions.

The auditor must go through each finding with you to confirm the evidence is right, which is your chance to produce a laboratory report the auditor missed. The auditor may not suggest the cause or the remedy.

Correction, root cause and corrective action under clause 10.2

ISO 14001:2026 places the requirement in clause 10.2, Nonconformity and corrective action, whoever raised the finding: the certification auditor, a regulator, a complaint or your own internal audit. Continuing the effluent example:

Correction: contain the instance and its consequences

Commission the missing samples now, compare the results with the consent limits and record a compliance evaluation for the consent. If a result exceeds a limit, deal with the discharge itself and any duty to notify the regulator.

Root cause: why the sampling slipped

Keep asking why until the answer is a process, not a person. Suppose the quarterly sampling relied on one laboratory contact who had left the contractor, and the compliance obligations register listed the consent without linking it to a monitoring schedule. Then check whether the same weakness exists for other permits and sites.

Corrective action: remove the cause for good

Link each permit condition in the register to a scheduled monitoring task with an owner and a deputy, and add the evaluation of compliance to the monthly environmental review. "Reminded the environmental officer" is not a corrective action. Later, review whether the action worked, and keep the records.

Response deadlines and the evidence that closes a finding

ISO 14001 sets no response period. The certification body does, and states it at the closing meeting as the timeframe for your plan of correction and corrective action. It differs between bodies and grades, so confirm it in writing. It then verifies that your actions worked, by a further full audit, a limited follow-up visit or documented evidence.

Evidence that closes a finding proves something has changed. Promises and plans do not:

  • records created after the audit, such as the new laboratory results and the signed compliance evaluation;
  • the revised control itself, with its new revision and approval, such as the updated obligations register;
  • the first completed records produced under the revised control, never an empty template;
  • for effectiveness, monitoring data over enough time to show the gap has not reopened.

Eight typical ISO 14001 findings, with correction and corrective action

These are composites of findings raised across sectors, not extracts from any one report. Grades assume an isolated finding; the certification body decides each case.

FindingRequirement and usual gradeCorrectionCorrective action
A new solvent coating line was running; the aspects register predated it6.1.2 environmental aspects; 6.3 planning of changes
Minor; major if the aspect is significant and uncontrolled
Assess the line's aspects and set controls for any significant onesAspects review built into the change-planning step before new processes start
A waste carrier's licence in the legal register had expired six weeks before the audit6.1.3 compliance obligations
Minor
Obtain the current licence; check collections made in the intervalLicence expiry dates tracked with alerts and a named owner
Drums of waste oil stood outside the bunded store on open ground8.1 operational planning and control
Minor; major if a release has occurred
Move the drums into bunding; inspect the groundStorage rules posted at the point of use and checked in routine site inspections
The emergency plan covered fire only; no spill scenario had been planned or drilled8.2 emergency preparedness and response
Often major where significant spill potential exists
Add spill scenarios, place spill kits, brief the teamsScenarios taken from the aspects register; drills scheduled and reviewed
Stack emissions were reported from a meter whose calibration had lapsed9.1.1 monitoring and measurement
Minor; major if compliance with a limit cannot be shown
Recalibrate; assess the results reported since the lapseCalibration schedule covering every meter that supports compliance data
No evaluation of compliance had been carried out for the year at a second site9.1.2 evaluation of compliance
Typically major: fulfilment of obligations is unproven
Evaluate the site's obligations and record the resultsEvaluation frequency set per obligation and monitored centrally
The internal audit programme had not reached the warehouse or the effluent plant9.2 internal audit
Minor or major, depending on how much of the scope was missed
Audit both areas before the response dateProgramme with defined objectives, criteria and scope, weighted by significant aspects
A diesel spill was logged "closed" with no cause recorded; a second spill followed10.2 nonconformity and corrective action
Minor; major if the pattern is systemic
Reopen the record; check the refuelling area nowCause investigated from both events; closure only after an effectiveness check

What an unresolved major costs you

Before the first certificate

The certification body cannot decide in your favour while a major is unverified. If it cannot verify the correction and corrective action within six months after the last day of Stage 2, a fresh Stage 2 is required before certification can be recommended.

During the certificate's life

Leaving a major open past its deadline is one way to fail certification requirements, which is a recognised ground for suspension. While suspended, the certification is temporarily invalid and cannot support a tender or a customer's supplier assessment. If the matter is not resolved, the certificate is withdrawn or its scope reduced.

At recertification

Any major raised at the recertification audit has to be corrected and verified before the certificate expires, or the certificate is not renewed. Certification can be restored within six months of expiry once the outstanding work is done; after that, at least a Stage 2 is needed. The surveillance and recertification guide covers the full three-year cycle.

Keeping findings few, and minor

Most environmental majors can be predicted months ahead: an unevaluated site, a fire-only emergency plan, or small waste-handling lapses that add up to one systemic weakness. Let your internal audit reach every site and significant aspect first, and close actions only when the evidence exists. The common mistakes guide lists the ten that most often fail audits, and the audit questions guide shows the evidence auditors ask for.

How Sterling handles environmental audit findings

Every finding answered with a cause, an action and the proof.

Sterling's expert and experienced consultants conduct your internal audit before Stage 2, so gaps surface while there is time to fix them. When the certification body raises a finding, we work through the cause with the site owner, help you draft a response the reviewer can follow and keep the closure evidence in Effivity, included with the engagement. We ensure successful certification for our clients. Grading and the certification decision remain with the independent, accredited certification body; Sterling does not certify.

Book a free discovery call

ISO 14001 nonconformities: questions buyers ask

Is a permit exceedance automatically a major nonconformity?

No, not automatically. The certification body looks at whether your system detected the exceedance, dealt with it and acted on the cause. One nobody noticed, or one left without action, points to a failure of control and is far more likely to be graded major.

How many minor nonconformities are allowed at an ISO 14001 audit?

ISO/IEC 17021-1 sets no ceiling on minors. Before deciding, the certification body must have accepted your plan for every minor and verified every major. Several minors against the same requirement can, however, be combined into a major.

Can a nonconformity at a surveillance audit put our ISO 14001 certificate at risk?

Yes, if it is a major and it is not closed on time. A major left open past the deadline set by the certification body can lead to suspension and, if unresolved, withdrawal.

Can we challenge a nonconformity we think is wrong?

Yes, on the evidence and ideally before the closing meeting, by showing the record that proves the requirement was met. Accredited bodies also operate a formal appeals process.

Will nonconformities from our own internal audit count against us?

No, they count in your favour when handled well. The certification body expects internal audits to find problems and checks that each went through clause 10.2, with the cause analysed and effectiveness reviewed.

ISO 14001 implementation

ISO 14001 requirements

Get the document

We e-mail the document as a PDF link. Tell us who you are and where to send it.

A quick security check confirms the request comes from a person.

By requesting the document you agree to our privacy notice. Sterling uses these details to send it and to respond to your request. We never sell your data.

Talk to a consultant

Close your ISO 14001 audit findings with evidence the certification body accepts.

Tell us your goals, locations and target date. We’ll help you define the scope, timeline and next steps.

hello@sterling-grc.com

+1 201 263 4443 (global headquarters) · your nearest office and its number are at the top of this page

What would you like to achieve?

Choose a starting point. The enquiry form takes about a minute.

Your goal
Book my free discovery call

Continue to the enquiry form to share your details. Please do not include passwords, sensitive personal information or confidential files. A Sterling consultant replies within one working day. Privacy notice